E&MS – WORK ADVISORY
INDUSTRIAL WATER BACKFLOW SYSTEM  08/17/23 through 8/21/23

LOCATION:
Earth & Marine Sciences

UTILITY THAT WILL BE SHUT DOWN:
Domestic Cold Water (DCW), Domestic Hot Water (DHW) Industrial Cold Water (ICW) & Industrial Hot Water (IHW)

SCHEDULED DATE(S):
Wednesday, August 17th through Friday,  August 21st, 2023
7:00 AM – 4:00 PM Thursday 8/17/23 – BUILDING WATER SHUTDOWN PORTION

SCHEDULED TIME:
7:00 AM – 11:00 AM Thursday 8/17/23 – BUILDING WATER SHUTDOWN PORTION
7:00 AM – 4:00 PM DAILY FOR DURATION OF WORK

REASON:
Replacement of Industrial Cold Water Backflow Preventer

IMPACTS:
The duration of this work is over 2 days. The WATER SHUTDOWN is estimated at 4 hours in the morning on  Thursday , August 17th.

The following building systems will be affected:

This is a whole building water shutdown that includes Domestic Cold Water (DCW), Domestic Hot Water (DHW), Industrial Cold Water (ICW), Industrial Hot Water (IHW)

DCW/DHW
– All restrooms
– All commuter showers
– All emergency eyewash/showers
– All Drinking Fountains
– All kitchenettes

ICW/IHW
– All lab faucets and fume hoods
– Chilled water system makeup
– DI water system makeup


Please let us know if you have any questions.

Thank you,
PBSci Work Order Desk
Jenny Coleman 

 

Visit the PBSci Toolkit Divisional Resource Page

 