LOCATION(S):
Coastal Biology Building

UTILITY TO BE TESTED:
Standby Generator – Installation of new control system and testing

SCHEDULED DATE(S):
Saturday, 10/14/22

SCHEDULED TIME:
7:00 AM –  11:00 AM

REASON:
Install new settings on generator main breaker and HMI control system.  

IMPACTS:
Testing after setting installation may cause short periodic outages to normal facility power.
Please be advised that multiple tests may be needed during this work.
*If you have sensitive equipment that could be affected by a power outage or surge during the  transfer to standby power testing, please be advised to power down equipment and to not have ongoing experiments during this time that could be interrupted.

Please let us know if you have any questions.

Thank you,

Jenny Coleman
Haylee Kim
Physical & Biological Sciences Facilities