LOCATION:
Earth and Marine Science Building, C Block or “North” and D Block or “South”

UTILITIES TO BE SHUTDOWN:
Building Ventilation Systems (including fume hoods); Processed Cooling Water (connected with the Water Cooled Equipment), Compressed Air & Vacuum Systems, and 2nd Floor Domestic Hot Water (Showers).

SCHEDULED DATES:
D Block: Wednesday, May 1, 2024
C Block: Thursday, May 2, 2024

SCHEDULED TIME:
6:30 AM – 11:00 AM

REASON:
Preventative maintenance, repair, and air filter replacement

IMPACTS:
These utilities will not be available during this work; please plan lab activities accordingly. During this time, there will be no HVAC or ventilation available in the building. Please remember to keep your fume hood sashes closed during this shutdown. Please refrain from working with hazardous materials anywhere in the C or D Blocks during the shutdown period. Water cooled equipment will not be supported and compressed air & vacuum systems will not be operational.

DETAILS:
Please remember to close your fume hood sashes the evening prior to your block’s shutdown, and refrain from working with any hazardous materials in the building during the shutdown period. Fume Hoods will go into alarm if opened during shutdown.

Please let us know if you have any questions.