LOCATION:
Campus Wide

WORK TO BE COMPLETED:
Fire Hydrant Flushing

SCHEDULED DATES:
Monday, June 17 through Friday, July 26, 2024

SCHEDULED TIME:
6:00 AM to 3:30 PM

REASON:
Annual maintenance to maintain water quality standards.

DETAILS:
The UCSC Physical Plant is conducting the annual maintenance/flushing of key fire hydrants throughout campus. This flushing requires a high flow of water for one minute at each hydrant. 

IMPACTS:
There may be short delays for pedestrians and vehicles along roadways during individual fire hydrant flushing cycles. You may see/hear crew members completing this work. This maintenance will be taking place during summer in an effort to minimize impacts.

*As a result of hydrant flushing, temporary discoloration of the water can occur inside local buildings.  This is caused by minerals dissolved in the water, and is not harmful.

Please let us know if you have any questions.