LOCATION(S):
Earth and Marine Science Building, C Block or “North” and D Block or “South”
UTILITIES THAT WILL BE SHUT DOWN:
All Building Ventilation Systems (including fume hoods), Processed Cooling Water (connected w/ the Water Cooled Equipment), Compressed Air & Vacuum Systems, and 2nd Floor Domestic Hot Water (Showers).
SCHEDULED DATES:
D Block/South: Wednesday, October 30, 2024
C Block/North: Thursday, Oct 31, 2024
(add this to your calendar)
SCHEDULED TIME:
6:30 AM to 11 AM, each day
REASON:
Preventative maintenance, repair, and air filter replacement
IMPACTS:
During these times, there will be no HVAC or ventilation available in these parts of the building. Please remember to keep your fume hood sashes closed during this shutdown. Please refrain from working with hazardous materials in the designated areas during the shutdown period. Water cooled equipment will not be supported and compressed air & vacuum systems will not be operational. Additionally, hot water on the second floor will not function.
DETAILS:
Please remember to close your fume hood sashes the evening prior to this shutdown, and refrain from working with any hazardous materials in the building during the shutdown period. Fume Hoods will go into alarm if opened during shutdown.
Please let us know if you have any questions.