LOCATION:
Physical Sciences Building

UTILITY THAT WILL BE SHUT DOWN:
Building Ventilation and Mechanical Systems, including, but not limited to: Fume Hoods, Processed Cooling Water (connected w/ the Water Cooled Equipment), RO Water, Vacuum System.

SCHEDULED DATE:
Thursday, March 13, 2025 (Add this to your calendar)

SCHEDULED TIME:
6:00 AM to 11:00 AM

REASON:
Preventive maintenance, repair and air filter replacement.

IMPACTS:
HVAC, processed cooling water & connected equipment, RO Water, and Fume hoods will not function during this shutdown. Please refrain from working with hazardous materials during the shutdown period. **There will be periodic interruptions to building airflow.

*** Use of Steam Equipment (autoclaves, glass washers, etc) while building ventilation systems are down may set-off the building Fire Alarm System, causing a building-wide evacuation.***

DETAILS:
Please remember to close your Fume hood sashes the evening prior to the shutdown and refrain from working with hazardous materials during the shutdown period.

Please let us know if you have any questions.