LOCATION(S):
All Science Hill buildings (supported by Cogen)
UTILITY TO BE SHUT DOWN:
Fackler Cogen Turbine and Central Heat Plant Systems
SCHEDULED DATE(S):
Sunday, July 6 to Thursday, July 10, 2025 (add this to your calendar)
SCHEDULED TIME:
10:00 PM on 7/6 to 3:30 PM on 7/10
REASON:
Preparations of engine exchange in August, 2025.
IMPACTS:
The Central Cogen Engine that provides back-up power to Science Hill buildings will be SHUT DOWN and offline.
***Normal PG&E utility power to campus will not be affected.***
During this off-line period, IF PG&E POWER FAILS and an unplanned outage occurs, the Science Hill buildings that rely on Cogen for back-up power will only have power from their respective building standby generators.
Please let us know if you have any questions.