**The work being performed for this Work Advisory directly supports the large, ongoing Sinsheimer HVAC & Mechanical Controls Project currently underway in the SOUTH Wing Labs. For more information on this project, please see the related Toolkit Sinsheimer HVAC & Mechanical Controls Project Post.

LOCATION:
Sinsheimer Labs – 204 & 206

The work being performed for this Shutdown directly supports the ongoing Sinsheimer HVAC & Mechanical Controls Project currently underway in the South Wing Labs.

WORK BEING PERFORMED:
PPDO & Geo H. Wilson Contractors will be starting the large long term Sins HVAC Controls Project  to replace HVAC systems in all South Wing labs, beginning  in SINS 204 & 206 next week.

SCHEDULED DATE(S):
Monday, August 25th – Thursday, September 9th, 2025* (add this to your calendar)
*estimated schedule

SCHEDULED TIME:
7:00 AM to 4:00 PM, Monday to Friday, Daily
*Work outside of these hours will be included as part of any Work Advisories.

IMPACTS:
This construction involves workers accessing the HVAC & Mechanical systems in the ceilings above lab benches, as well as demo work to remove fume hoods. You can expect to see workers present in the building daily, and there will be construction noise, debris removal and dust South Wing corridors. (Noise will pervade throughout the south wing and, in many cases, to other floors of the building.)

Alternate Work Site Accommodations:
Although we do not anticipate significantly disruptive noise levels, PBSci Facilities has some designated “hoteling” office and collaborative spaces that can be reserved on a first come, first serve basis if you should need to work offsite at any point during this work. These spaces are limited and should only be used for short term accommodation.  Please send any requests to pbsciwodesk@ucsc.edu.

Thank you for your ongoing support and patience as this long term project continues over the course of the next 12-14 months.  Please let us know if you have any questions.

– PBSci Facilities