LOCATION:
Earth and Marine Science Building – C Block and D Block
UTILITIES THAT WILL BE SHUT DOWN:
Intermittent Shutdowns of Building Ventilation Systems (including fume hoods), Processed Cooling Water (connected w/ the Water Cooled Equipment), and Compressed Air & Vacuum Systems
SCHEDULED DATES:
Wednesday, October 29 to Thursday, October 30, 2025 (add this to your calendar)
SCHEDULED TIMES:
6:30 AM to 11:00 AM, both days
REASON:
Preventative maintenance, repair, and air filter replacement.
IMPACTS:
During this time, there will be intermittent interruptions to HVAC and ventilation in the building. Please remember to keep your fume hood sashes closed during this shutdown and refrain from working with hazardous materials during the shutdown period.
Water cooled equipment will not be supported and compressed air & vacuum systems will not be operational.
DETAILS:
Please remember to close your fume hood sashes the evening prior to this shutdown, and refrain from working with any hazardous materials in the building during the shutdown period. Fume Hoods will go into alarm if opened during shutdown.