LOCATION(S):
Sinsheimer Laboratories – South Wing

UTILITY TO BE SHUT DOWN:
Building heating and cooling system (ambient air temperature)

SCHEDULED DATE(S):
Saturday, January 3 to Tuesday, January 6, 2026

SCHEDULED TIME(S):
01/03/26 to 4 PM (estimated) on 01/06/26

REASON:
During the scheduled curtailment work for the critical deferred maintenance project in SINS, additional work was discovered to be necessary to get cooling & heating coils online. 

IMPACTS:
There will be no building heat or cooling in the South Wing of Sinsheimer Labs during this shutdown. Building ventilation will remain on, including exhaust – however, the temperatures in the South Wing Labs may be influenced by outside air temperature. 

If you would like to borrow a small space heater, please reach out to us at pbsciwodesk@ucsc.edu. These will be first come first serve – we have a limited number to offer.

Please let us know if you have any questions.