LOCATION:
Biomedical Sciences Building – Floors 1 to 4

UTILITY AFFECTED:
Building Ventilation Systems including but not limited to: Fume Hoods, Vacuum System, Building Heating and Cooling.

REASON:
Heating water coil leak repairs for air handler 1 (AHU-1)

SCHEDULED DATE:
Tuesday, February 17, 2026 (add this to your calendar)

SCHEDULED TIME:
6:00 AM to 11:00 AM

IMPACTS:
HVAC and Fume hoods on floors 1 through 4 will not function during this shutdown. Please refrain from working with hazardous materials during the shutdown period. 

*** Use of Steam Equipment (autoclaves, glass washers, etc) while building ventilation systems are down may set-off the building Fire Alarm System, causing a building-wide evacuation.***

Vivarium HVAC will not be impacted.

DETAILS:
Please remember to close your Fume hood sashes the evening prior to the shutdown and refrain from working with hazardous materials during the shutdown period.

Please let us know if you have any questions or concerns.