Feb 8, 2024 | Biomedical Sciences Building, Center for Adaptive Optics, Coastal Biology Building, Facilities Management, Interdisciplinary Sciences Building, Physical Sciences Building
LOCATIONS: BioMedical Sciences (two passenger elevators), Center for Adaptive Optics (passenger elevator), Coastal Biology (two passenger elevators), Interdisciplinary Sciences (passenger elevator), Physical Sciences (passenger and freight elevators), and Westside...
Jan 8, 2024 | Biomedical Sciences Building, Facilities Management
LOCATION(S): Biomedical Sciences Building UTILITY TO BE TESTED: Fire Alarm System SCHEDULED DATE(S): Monday, January 22, 2024 through Friday, February 23, 2024 *Testing, maintenance, and repairs will be ongoing during this time. No alarms will sound during this...
Sep 12, 2023 | Biomedical Sciences Building, Facilities Management
LOCATION(S): Biomedical Sciences Building UTILITY TO BE SHUT DOWN: Standby Generator (Work being performed on only 1 of 3 generators that support building, others will remain online). SCHEDULED DATE(S): Friday, 9/22/23 SCHEDULED TIME: 6:00 AM – 5:00 PM...
Sep 11, 2023 | Biomedical Sciences Building, Facilities Management
LOCATION (S): Biomedical Sciences Building UTILITY THAT WILL BE SHUT DOWN: Building Ventilation Systems, including Fume Hoods, Processed Cooling Water (connected to ice machines and any water-cooled equipment in rooms 164, 264, and 364). Building Steam will be...
May 23, 2023 | Biomedical Sciences Building, Facilities Management, Physical Sciences Building
LOCATION(S): Physical Sciences Building, Biomedical Sciences Building and McHenry Library UTILITY TO BE TESTED: Elevator door smoke curtain ***HORNS WILL NOT BE SOUNDED *If you hear an alarm, respond as you would to a regular alarm. SCHEDULED DATE(S): Tuesday, 6/6/23...
Mar 9, 2023 | Biomedical Sciences Building, Facilities Management
LOCATION(S): Biomedical Sciences Building UTILITY TO INSPECTED & TESTED: Building Fire Sprinkler Systems and Flow Switches WORK TO BE PERFORMED: The Plumbing & Fire Alarm Shops will be performing the testing of the building Fire Sprinkler waterflow and tamper...
Mar 9, 2023 | Biomedical Sciences Building, Facilities Management
LOCATION (S): Biomedical Sciences Building UTILITY THAT WILL BE SHUT DOWN: Building Ventilation Systems, including Fume Hoods, Processed Cooling Water (connected to ice machines and any water-cooled equipment in rooms 164, 264, and 364). Building Steam will be...
Nov 28, 2022 | Biomedical Sciences Building, Center for Adaptive Optics, Earth & Marine Sciences Building, Facilities Management, Interdisciplinary Sciences Building, Natural Sciences 2 Annex, Natural Sciences 2 Building, Physical Sciences Building, Sinsheimer Building, Thimann Building
LOCATION(S): Biomedical Sciences, Earth & Marine Science, Natural Science II, Center for Adaptive Optics, Interdisciplinary Studies, Physical Sciences, Sinsheimer Labs, Thimann Labs. *Testing will start at BioMed and proceed from building to building in the order ...
Sep 8, 2022 | Biomedical Sciences Building, Facilities Management
PBSci Facilities Notification BIOMED – HVAC & BUILDING STEAM – SHUTDOWN – 9/22/22 LOCATION (S): Biomedical Sciences UTILITY THAT WILL BE SHUT DOWN: Building Ventilation Systems, including Fume Hoods, Processed Cooling Water (connected to ice machines and any...
Aug 18, 2022 | Biomedical Sciences Building, Facilities Management
PBSci Facilities Notification BIOMED – UTILITY SHUTDOWN – ELEVATOR – 8/25/22 LOCATION(S):Biomedical Sciences Building UTILITY TO BE SHUT DOWN:Passenger & Freight Elevators (not simultaneously) SCHEDULED DATE(S):8/25/22 SCHEDULED TIME:7:00 am...