Toolkit
  • Home
    • Academic Departments
      • ASTR
      • CHEM
      • EPS
      • EEB
      • MATH
      • MCDB
      • METX
      • OCEA
      • PHYS
    • Personnel
    • Communications
    • Computer Support
    • Curriculum Management
    • Divisional Accounting
    • Event & Award Support
    • Facilities Management
    • Philanthropy
    • Research Accounting
  • Message Center
  • Org Charts
  • Directory
Select Page

STEINHART WAY – TRAFFIC ADVISORY/ROAD CLOSURE – EFFECTIVE 01/02/25

Jan 2, 2025 | All Division, Facilities Management

LOCATION(S): Steinhart Way, See map for locations SCHEDULED DATE(S): Thursday, January 2, 2025 – Permanent Closure IMPACTS: Steinhart Way was previously a Restricted Access Road and has been closed to private vehicles, as part of a pilot program to support...

SCIENCE HILL – UTILITY TESTING – FIRE ALARM – 12/02 – 12/06/24

Nov 18, 2024 | All Division, Facilities Management

LOCATION: All Science Hill buildings Biomedical Sciences, Center for Adaptive Optics, Earth & Marine Science, Interdisciplinary Studies, Natural Science II, Physical Sciences, Sinsheimer Labs, and Thimann Labs UTILITY TO BE TESTED: Fire Alarm – HORNS WILL BE...

SCIENCE HILL – COGEN HEAT PLANT – SHUTDOWN NOTIFICATION – 12/16 – 12/17/24

Nov 18, 2024 | All Division, Facilities Management

LOCATION(S): All Science Hill buildings (supported by Cogen) **This will not impact Coastal Science Campus nor Westside Research Park UTILITY TO BE SHUT DOWN: Fackler Cogen Turbine SCHEDULED DATE(S): Monday, December 16 to Tuesday, December 17, 2024 (Add this to your...

CAMPUS WIDE  – UTILITY INSPECTION & TESTING – STANDBY & EMERGENCY GENERATORS – 11/04 TO 11/30/24

Oct 18, 2024 | All Division, Facilities Management

LOCATION(S): All Standby Emergency Generators on Residential Campus, Westside Research Park, and the Coastal Science Campus UTILITY TO BE TESTED: Standby & Emergency Generators ***Load will not transfer. There will be no disruption of power. SCHEDULED DATE(S):...

SCIENCE HILL – COGEN HEAT PLANT – SHUTDOWN NOTIFICATION – 09/08 – 09/13/2024

Aug 29, 2024 | All Division, Facilities Management

LOCATION(S): All Science Hill buildings (supported by Cogen) UTILITY TO BE SHUT DOWN: Fackler Cogen Turbine SCHEDULED DATE(S): Sunday, September 8 to Friday, September 13, 2024 (add this to your calendar) SCHEDULED TIME: 10 PM on Sunday to 8 PM on Friday REASON:...

UTILITY TESTING NOTICE – EMERGENCY & STANDBY GENERATORS – 09/03/24 THROUGH 09/25/23

Aug 26, 2024 | All Division, Facilities Management

LOCATION(S): Campus Wide (See schedule for your building below)* UTILITY THAT WILL BE TESTED: Emergency Generators & Standby Generators ***ALL STANDBY CIRCUITS WILL TRANSFER TO GENERATOR POWER*** SCHEDULED DATES: Tuesday, September 3 through Wednesday, September...

CAMPUS WIDE – STAGE 1 ALERT – REDUCED COOLING FOR BUILDINGS AND EQUIPMENT– 08/09 – 08/11/24

Aug 9, 2024 | All Division, Facilities Management

LOCATION(S): Campus Wide UTILITY TO BE SHUT DOWN: Cooling Water System: Reduced building cooling. Temperature adjustments on building chillers, room air conditioning, and on equipment cooling water affecting laboratory equipment such as mass spectrometers, chillers,...

CAMPUS WIDE – STAGE 1 ALERT – REDUCED COOLING FOR BUILDINGS AND EQUIPMENT– 8/06 – 8/07/24

Aug 6, 2024 | All Division, Facilities Management

LOCATION(S): Campus Wide UTILITY TO BE SHUT DOWN: Cooling Water System: Reduced building cooling. Temperature adjustments on building chillers, room air conditioning, and on equipment cooling water affecting laboratory equipment such as mass spectrometers, chillers,...

CAMPUS WIDE – STAGE 1 ALERT – REDUCED COOLING FOR BUILDINGS AND EQUIPMENT– 7/24 – 7/26/24

Jul 24, 2024 | All Division, Facilities Management

LOCATION(S): Campus Wide UTILITY TO BE SHUT DOWN: Cooling Water System: Reduced building cooling. Temperature adjustments on building chillers, room air conditioning, and on equipment cooling water affecting laboratory equipment such as mass spectrometers, chillers,...

CAMPUS WIDE – STAGE 1 ALERT – REDUCED COOLING FOR BUILDINGS AND EQUIPMENT– 7/18 – 7/20/24

Jul 18, 2024 | All Division, Facilities Management

LOCATION(S): Campus Wide UTILITY TO BE SHUT DOWN: Cooling Water System: Reduced building cooling. Temperature adjustments on building chillers, room air conditioning, and on equipment cooling water affecting laboratory equipment such as mass spectrometers, chillers,...
Page 4 of 9« First«...23456...»Last »
Back to the Message Center

Recent messages

  • ISB – WORK ADVISORY – ROOF WORK – 12/15 – 12/18/25
  • **NEXT TUES** SINS – UTILITY SHUTDOWN – DOMESTIC COLD AND HOT WATER – 12/16/25
  • **BACK IN SERVICE** EMS – EMERGENCY SHUTDOWN – RO/DI WATER SYSTEM – 12/08/25 – TBD
  • **THIS TUESDAY** SINS SOUTH – UTILITY SHUTDOWN – HVAC INCLUDING FUME HOODS – 12/09/25
  • CBB – UTILITY TESTING – FIRE SPRINKLER SYSTEMS – 12/01 – 12/31/25
Pantheon v1.0
For Faculty & Staff | Division of Physical & Biological Sciences | About Toolkit
Site feedback

Login with CruzID