Toolkit
  • Home
    • Academic Departments
      • ASTR
      • CHEM
      • EPS
      • EEB
      • MATH
      • MCDB
      • METX
      • OCEA
      • PHYS
    • Personnel
    • Communications
    • Computer Support
    • Curriculum Management
    • Divisional Accounting
    • Event & Award Support
    • Facilities Management
    • Philanthropy
    • Research Accounting
  • Message Center
  • Org Charts
  • Directory
Select Page

PBSCI FACILITIES UTILITY SHUTDOWN – NS2 – LAB COMPRESSED AIR – **TUESDAY 9/12/23**

Sep 8, 2023 | Facilities Management, Natural Sciences 2 Building

LOCATION: Natural Sciences 2 UTILITY AFFECTED: Building Lab Air SCHEDULED DATE: ***Tuesday, 9/12/23 SCHEDULED TIME: 7:00AM to 11:00AM IMPACTS: There will be no compressed air available during this work, please refrain from working with hazardous chemicals or...

PBSCI FACILITIES – UTILITY TESTING NOTICE – EMERGENCY & STANDBY GENERATORS  – 9/11/23 THROUGH 9/26/23

Sep 6, 2023 | All Division, Facilities Management

EMERGENCY & STANDBY GENERATOR TESTING 9/11/23 THROUGH 9/26/23 LOCATION(S): Campus Wide (See schedule for your building below)* UTILITY THAT WILL BE TESTED: Emergency & Standby Generators ***ALL STANDBY CIRCUITS WILL TRANSFER TO GENERATOR POWER*** SCHEDULED...

PSB SHUTDOWN – HVAC/PROCESS COOLING WATER/MECHANICAL SYSTEMS AND FIRE DOOR TESTING 9/14/23

Sep 6, 2023 | Facilities Management, Physical Sciences Building

LOCATION: Physical Sciences Building UTILITY THAT WILL BE SHUT DOWN: Building Ventilation and Mechanical Systems including but not limited to:  Fume Hoods, Processed Cooling Water (connected w/ the Water Cooled Equipment), RO Water. Compressed Lab Air will not be...

PBSci Facilities Notification – NS2 – UTILITY SHUTDOWN – VENTILATION SYSTEM INCLUDING FUME HOODS – 8/31/23

Aug 22, 2023 | Facilities Management, Natural Sciences 2 Annex, Natural Sciences 2 Building

LOCATION: Natural Sciences 2 UTILITY THAT WILL BE SHUT DOWN: Ventilation System — including Fume hoods SCHEDULED DATE(S): Thursday, August 31st, 2023 SCHEDULED TIME: 6:00 AM to 11:00 AM REASON: Scheduled Preventive Maintenance and air filter replacement. IMPACTS: HVAC...

SHUTDOWN NOTICE – **1 WEEK REMINDER**–HIGH IMPACT ELECTRICAL SHUTDOWN – BIOMED &  JBEB/ENGINEERING 2 –  8/12/23 – 8/15/23 *DAILY*

Aug 4, 2023 | All Division, Facilities Management

LOCATIONS: BioMedical Sciences Building Jack Baskin Engineering Engineering 2 UTILITY TO BE SHUTDOWN: Electrical Utility Power* DATES OF SHUTDOWN: Saturday August 12th, 2023 through Tuesday, August 15th, 2023 (8-10 hours daily) *Due to the nature of this work, this...

E&MS – WORK ADVISORY – INDUSTRIAL WATER BACKFLOW SYSTEM – 8/9/23

Jul 31, 2023 | Earth & Marine Sciences Building, Facilities Management

LOCATION: Earth & Marine Sciences UTILITY THAT WILL BE SHUT DOWN: Domestic Hot Water (DHW) and Heating Water SCHEDULED DATE(S): Wednesday, August 9th, 2023 SCHEDULED TIME: 6:00 AM – 3:30 PM  REASON: Repair main heating control valve and repair leaking...

E&MS – WORK ADVISORY INDUSTRIAL WATER BACKFLOW SYSTEM  08/16/23 through 8/18/23

Jul 28, 2023 | Earth & Marine Sciences Building, Facilities Management, Green House, Uncategorized

E&MS – WORK ADVISORY INDUSTRIAL WATER BACKFLOW SYSTEM  08/17/23 through 8/21/23 LOCATION: Earth & Marine Sciences UTILITY THAT WILL BE SHUT DOWN: Domestic Cold Water (DCW), Domestic Hot Water (DHW) Industrial Cold Water (ICW) & Industrial Hot Water...

NS2 & ISB – WORK ADVISORY INDUSTRIAL WATER BACKFLOW SYSTEM  08/16/23 through 8/18/23

Jul 28, 2023 | Facilities Management, Interdisciplinary Sciences Building, Natural Sciences 2 Building

NS2 & ISB – WORK ADVISORY INDUSTRIAL WATER BACKFLOW SYSTEM 08/16/23 through 8/18/23 LOCATION: Natural Sciences 2 & Interdisciplinary Sciences UTILITY THAT WILL BE SHUT DOWN: Industrial Hot & Cold Water Backflow System  SCHEDULED DATE(S): Wednesday,...

SHUTDOWN NOTICE – 2 WEEK REMINDER – HIGH IMPACT ELECTRICAL SHUTDOWN – BIOMED & JBEB/ENGINEERING 2 – 8/12/23 – 8/15/23 *DAILY*

Jul 28, 2023 | All Division, Facilities Management

LOCATIONS: BioMedical Sciences Building Jack Baskin Engineering Engineering 2 UTILITY TO BE SHUTDOWN: Electrical Utility Power* DATES OF SHUTDOWN: Saturday August 12th, 2023 through Tuesday, August 15th, 2023 (8-10 hours daily) *Due to the nature of this work, this...

PBSci Facilities Notification UTILITY SHUTDOWN – SINSHEIMER LABS HVAC/VENTILATION * INCLUDING FUME HOODS – 8/2/23 & 8/3/23

Jul 23, 2023 | Facilities Management, Sinsheimer Building, Uncategorized

PBSci Facilities Notification UTILITY SHUTDOWN – SINSHEIMER LABS LOCATION: Sinsheimer Laboratories UTILITY THAT WILL BE SHUT DOWN: Ventilation System — including Fume hoods SCHEDULED DATE(S): North — Wednesday, August 2, 2023 South — Wednesday, August 3, 2023...
Page 17 of 29« First«...10...1516171819...»Last »
Back to the Message Center

Recent messages

  • SINS – UTILITY SHUTDOWN – HVAC/VENTILATION INCLUDING FUME HOODS – 09/05 – 09/07/25
  • SINSHEIMER LABS – WORK ADVISORY – HVAC & MECHANICAL CONTROLS PROJECT – BEGINS MONDAY 8/25/25
  • Two open calls: McKnight Foundation, 1-Brain Disorders Award and 2-Scholar Awards
  • Announcing Limited Submission – Greenwall Foundation – 2026 Faculty Scholars Program
  • Sinsheimer Labs – PPDO Mechanical, HVAC & Controls Renewal Project – Information and Details
Pantheon v1.0
For Faculty & Staff | Division of Physical & Biological Sciences | About Toolkit
Site feedback

Login with CruzID