Jun 1, 2021 | All Division, Facilities Management
PBSci Facilities EMERGENCY UTILITY SHUT DOWN LOCATION(S): Central Heat Plant – affecting all of Science Hill COGEN powered buildings UTILITY TO BE SHUT DOWN: Gas Fired Turbine that provides COGEN power to buildings during electrical...
May 24, 2021 | All Division, Facilities Management
Hello PBSci Division, Lab Managers and Facility Personnel – In our continuing effort to reach the UC Office of the President’s appointed goals of zero waste initiatives, we wanted to inform you of a styrofoam collection day at PSB next week. The...
May 19, 2021 | Facilities Management, Physical Sciences Building
WORK TO BE PERFORMED: The heating and cooling coils located within the PSB rooftop air handler units are being replaced, and new fans are being installed. Other maintenance needs are being addressed concurrent with this shutdown to minimize future...
May 11, 2021 | All Division, Facilities Management
Dear Science Hill Community, We received a report that an unauthorized person gained access to the Physical Sciences Building last night. The police were called and the intruder departed the area before they arrived. We have fixed the broken lock on the room the...
Apr 21, 2021 | All Division, Facilities Management
Hello PBSci Division, Lab Managers and Facility Personnel – In our continuing effort to reach the UC Office of the President’s appointed goals of zero waste initiatives, we wanted to inform you of a styrofoam collection day at PSB next week. ...
Apr 14, 2021 | Earth & Marine Sciences Building, Facilities Management
LOCATION (S): Earth and Marine Sciences Building, C Block or “North” and D Block or “South” UTILITY THAT WILL BE SHUT DOWN: Building Ventilation Systems (including fume hoods); Processed Cooling Water (connected w/ the Water Cooled Equipment),...
Mar 8, 2021 | Facilities Management
Home 5 Category: Facilities Management ( Page 16 ) Filing Insurance Claims The University has a variety of insurance programs that may provide insurance coverage when something goes wrong. An overview of property claims and links to additional information can be...
Mar 4, 2021 | Biomedical Sciences Building, Facilities Management
LOCATION (S): Biomedical Sciences UTILITY THAT WILL BE SHUT DOWN: Building Ventilation Systems, including Fume Hoods, Processed Cooling Water (connected to ice machines and any water-cooled equipment in rooms 164, 264, and 364). Building Steam will be affected. Use...
Feb 26, 2021 | Facilities Management, Physical Sciences Building
LOCATION(S): Physical Sciences Building UTILITY TO BE SHUT DOWN: Building Ventilation and Mechanical Systems- including Fume Hoods, Processed Cooling Water & DI/RO Water SCHEDULED DATE: Thursday, March 11, 2021 SCHEDULED TIME: 6:00 AM – 11:00 AM REASON:...
Feb 4, 2021 | All Division, Facilities Management
Hello PBSci Division, Lab Managers and Facility Personnel – In our continuing effort to reach the UC Office of the President’s appointed goal of zero waste initiatives, we wanted to inform you of a styrofoam collection day at PSB on February...