Toolkit
  • Home
    • Academic Departments
      • ASTR
      • CHEM
      • EPS
      • EEB
      • MATH
      • MCDB
      • METX
      • OCEA
      • PHYS
    • Personnel
    • Communications
    • Computer Support
    • Curriculum Management
    • Divisional Accounting
    • Event & Award Support
    • Facilities Management
    • Philanthropy
    • Research Accounting
  • Message Center
  • Org Charts
  • Directory
Select Page

BIOMED – UTILITY SHUTDOWN – ELEVATOR – 8/25/22

Aug 18, 2022 | Biomedical Sciences Building, Facilities Management

PBSci Facilities Notification BIOMED – UTILITY SHUTDOWN – ELEVATOR – 8/25/22   LOCATION(S):Biomedical Sciences Building UTILITY TO BE SHUT DOWN:Passenger & Freight Elevators (not simultaneously)   SCHEDULED DATE(S):8/25/22 SCHEDULED TIME:7:00 am...

NS2- UTILITY SHUTDOWN– VENTILATION SYSTEM INCLUDING FUME HOODS – 8/25/22

Aug 10, 2022 | Facilities Management, Natural Sciences 2 Building

PBSci Facilities Notification NS2- UTILITY SHUTDOWN– VENTILATION SYSTEM INCLUDING FUME HOODS – 8/25/22 LOCATION:Natural Sciences 2 UTILITY THAT WILL BE SHUT DOWN:Ventilation System — including Fume hoods SCHEDULED DATE(S):Thursday 8/25/22 SCHEDULED TIME:6:00 am...

CBB/HEADHOUSE & GREENHOUSE BUILDINGS – HVAC/PROCESS COOLING WATER/MECHANICAL SYSTEMS – SHUTDOWN – 8/18/22

Aug 3, 2022 | Coastal Biology Building, Facilities Management

PBSci Facilities Notification HVAC/PROCESS COOLING WATER/MECHANICAL SYSTEMS – PLANNED MAINTENANCE LOCATION:Coastal Biology Building (CBB) Headhouse & Greenhouse Buildings,  CSC Core Building, CSC Auxiliary Building. UTILITIES AFFECTED:Building...

NOISE & WORK ADVISORY–SCIENCE HILL – 8/15/22 – 9/9/22

Aug 3, 2022 | All Division, Facilities Management

PBSci Facilities Notification NOISE & WORK ADVISORY – SCIENCE HILL  Pedestrian Walkway Repairs LOCATIONS & AREAS TO BE AFFECTED: Science Hill – Multiple locations:- Steinhart Way South Pathway leading  to the back of Thimann Lecture Hall-...

BIOMED – UTILITY SHUTDOWN & WORK ADVISORY –  ELEVATOR TESTING – 8/16/2022

Aug 2, 2022 | Biomedical Sciences Building, Facilities Management

PBSci Facilities Notification BIOMED – UTILITY SHUTDOWN & WORK ADVISORY –  ELEVATOR TESTING – 8/16/2022   LOCATION(S): Biomedical Sciences UTILITY TO BE SHUT DOWN: Passenger & Freight Elevators (not simultaneously) SCHEDULED...

SINS – UTILITY SHUTDOWN – DOCK LEVELERS – 7/28/22

Jul 13, 2022 | Facilities Management, Sinsheimer Building

PBSci Facilities NotificationUTILITY SHUTDOWN – SINSHEIMER – DOCK LEVELERS  – 7/28/22   LOCATION(S):Sinsheimer UTILITY AFFECTED:Dock Leveler SCHEDULED DATE:Thursday 7/28/22 SCHEDULED TIME:7:00 AM to 5:00 PMREASON:Scheduled maintenance. IMPACTS:Dock...

NOISE & WORK ADVISORY – SCIENCE HILL – 7/20/22 THROUGH 7/28/22

Jul 11, 2022 | Facilities Management

PBSci Facilities Notification NOISE & WORK ADVISORY – SCIENCE HILL __________________________________________________ RED HILL ROAD REPLACEMENT PROJECT The Demolition work on Red Hill Road will begin on Wednesday 7/20/22. This notification outlines the days...

ISB – UTILITY SHUTDOWN – HVAC & VENTILATION SYSTEM – 07/06/22

Jun 27, 2022 | Facilities Management, Interdisciplinary Sciences Building

LOCATION(S): Interdisciplinary Science Building UTILITY TO BE SHUT DOWN: HVAC & Ventilation System SCHEDULED DATE(S): Wednesday, 07/06/22 SCHEDULED TIME: 6:30 AM to 3:30 PM REASON: Preventive maintenance and air filter replacement.   IMPACTS: There will...

HIGH IMPACT TRAFFIC ADVISORY – RED HILL ROAD CLOSURE – 7/18/22 THROUGH 8/5/22

Jun 13, 2022 | All Division, Facilities Management

RED HILL ROAD CLOSURE 7/18/22 THROUGH 8/5/22 LOCATION: Lower Red Hill Road (please see attached diagram). REASON: Deferred Maintenance — Red Hill Road Repair Project. Includes various critical road repair activities, resurfacing and overall maintenance. SCHEDULED...

BIOMED – SHUT DOWN – BUILDING *HOT* PROCESS, DOMESTIC & INDUSTRIAL WATER SYSTEMS – 4/11/22 THROUGH 4/22/22

Apr 6, 2022 | Biomedical Sciences Building, Facilities Management

PBSci SHUTDOWN NOTICE BioMed Hot Water Systems LOCATION(S): Biomedical Sciences Building UTILITY TO BE SHUT DOWN: Hot Water for the duration of the project Fire Alarms in the mechanical room will be tested during the daytime work hours SCHEDULED DATES: 4/11/22...
Page 21 of 27« First«...10...1920212223...»Last »
Back to the Message Center

Recent messages

  • Call for Notices of Intent (NOI): NSF MRI program, NOIs due July 28, 2025
  • SCIENCE HILL – WORK ADVISORY – FIRE HYDRANT FLUSHING – 06/23 – 07/11/25
  • Announcing Limited Submission – Mark Foundation – Endeavor Awards 2025
  • **HIGH IMPACT** SCIENCE HILL – HEATING WATER – SHUTDOWN NOTIFICATION – 07/08 – 07/10/25
  • Open Call: Burroughs Wellcome Fund (BWF) – Climate Change and Human Health Seed Grants
Pantheon v1.0
For Faculty & Staff | Division of Physical & Biological Sciences | About Toolkit
Site feedback

Login with CruzID