BIOMED VIVARIUM – SHUTDOWN NOTIFICATION – NECROPSY ROOM FUME HOOD – 03/27 – 03/28/24

Mar 20, 2024 | Biomedical Sciences Building, Facilities Management

LOCATION(S): BioMedical Sciences  Building – Vivarium: Necropsy Room 0064 ONLY UTILITY TO BE SHUT DOWN: Fume hood exhaust fan (EF-7) SCHEDULED DATE(S): Wednesday, March 27 through Thursday, March 28, 2024 SCHEDULED TIME: 7:00 AM Wednesday to 3:00 PM Thursday...

THIM – UTILITY SHUTDOWN – INDUSTRIAL COLD WATER AND FIRE ALARM SYSTEM – 03/25/24

Mar 18, 2024 | Facilities Management, Thimann Building

LOCATION: Thimann labs: 2nd Floor, West Side UTILITY TO BE SHUT DOWN: Industrial Cold Water + Fire Alarm System (local to room 285 for hot work) SCHEDULED DATE: Monday, March 25, 2024 SCHEDULED TIME: 7:00 AM – 11:00 AM REASON: Connection for new autoclave in...

UTILITY INSPECTION/TESTING – EMERGENCY & STANDBY GENERATORS – CAMPUS WIDE – 04/01 – 04/23/24

Mar 18, 2024 | All Division, Facilities Management

LOCATION: Campus Wide (see building schedule below) UTILITY TO TESTED: Emergency & Standby Generators ***ALL STANDBY CIRCUITS WILL TRANSFER TO GENERATOR POWER*** SCHEDULED DATE(S): Monday, April 1 through Tuesday April 23, 2024 * Please see detailed schedule below...

CBB – UTILITY TESTING – FIRE ALARM – 03/25 – 03/28/24

Mar 13, 2024 | Coastal Biology Building, Facilities Management

LOCATIONS: Coastal Biology Building and South Science Complex (including Long Marine Lab, Ocean Health Building, and Seymour Center) UTILITY TO BE TESTED: Fire Alarm – HORNS WILL BE SOUNDED — THIS IS LOUD!  **If you do hear an alarm, respond as you would to a...

**CANCELLED** SINS ROOF/GREENHOUSE – WORK ADVISORY – DECK COATING REPLACEMENT – 03/20 – 03/22/24

Mar 13, 2024 | Facilities Management, Sinsheimer Building

LOCATION: Sinsheimer Labs Roof – Greenhouse Area WORK TO BE PERFORMED: Removing and replacing failed deck coating. SCHEDULED DATES: **TO BE RESCHEDULED SCHEDULED TIME: 7:00 AM – 5:00 PM Daily REASON: Warranty Deficiency IMPACTS: You may hear and/or see...

BIOMED – SHUTDOWN NOTIFICATION – VENTILATION SYSTEM/BUILDING STEAM – 03/21/24

Mar 7, 2024 | Biomedical Sciences Building, Facilities Management

LOCATION: BioMedical Sciences UTILITY AFFECTED: Building Ventilation System – including Fume Hoods, Processed Cooling Water connected to ice machines or any water cooled equipment in rooms 164, 264 & 364. Building Steam will also be affected.* *NOTE: Use of...

BIOMED – FIRE SPRINKLER SYSTEMS TESTING – 03/01 – 03/31/24

Mar 5, 2024 | Biomedical Sciences Building, Facilities Management

LOCATION: Biomedical Sciences Building UTILITY TO INSPECTED & TESTED: Building Fire Sprinkler Systems and Flow Switches WORK TO BE PERFORMED: The Plumbing & Fire Alarm Shops will be performing the testing of the building Fire Sprinkler waterflow and tamper...

**EXTENDED** PSB – UTILITY TESTING – FIRE ALARM SYSTEM 03/13 – 04/12/24

Feb 29, 2024 | Facilities Management, Physical Sciences Building

LOCATION(S): Physical Sciences Building UTILITY TO BE TESTED: Fire Alarm System SCHEDULED DATE(S): Wednesday, March 13 through Friday, April 12, 2024  *Testing, maintenance and repairs will be ongoing during this time. No alarms will sound during this testing. ...

PSB – UTILITY SHUTDOWN – HVAC INCLUDING FUME HOODS – 03/14/24

Feb 29, 2024 | Facilities Management, Physical Sciences Building

LOCATION: Physical Sciences Building UTILITY THAT WILL BE SHUT DOWN: Ventilation System — including Fume hoods SCHEDULED DATE(S): Thursday, March 14, 2024 SCHEDULED TIME: 6:00 AM to 11:00 AM REASON: Preventive maintenance and air filter replacement. IMPACTS: HVAC,...

**REVISED DATES** UTILITY TESTING – ELEVATOR RECALL – 04/02 – 04/19/24

Feb 27, 2024 | Center for Adaptive Optics, Coastal Biology Building, Facilities Management, Interdisciplinary Sciences Building

***Horns will NOT be sounded*** LOCATIONS: Center for Adaptive Optics (passenger elevator), Interdisciplinary Sciences (passenger elevator), Coastal biology (two passenger elevators), and Westside Research Park (passenger and freight elevators) Buildings UTILITY TO BE...
Page 21 of 37« First«...10...1920212223...30...»Last »
Back to the Message Center

Recent messages

  • SINS LABS – UTILITY SHUT DOWN – DEIONIZED WATER – 02/03/26
  • NS2 – WORK ADVISORY – LAB RENOVATIONS – 01/28 – 2/20/2026
  • BIOMED – UTILITY TESTING – FIRE ALARM SYSTEM – 02/04 – 03/06/26
  • CAMPUS WIDE  – UTILITY TESTING – STANDBY & EMERGENCY GENERATORS – 02/01 – 02/28/26
  • UPDATE UTILITY RESTORED SINS Restrooms Shutdown 1/20/26