Toolkit
  • Home
    • Academic Departments
      • ASTR
      • CHEM
      • EPS
      • EEB
      • MATH
      • MCDB
      • METX
      • OCEA
      • PHYS
    • Personnel
    • Communications
    • Computer Support
    • Curriculum Management
    • Divisional Accounting
    • Event & Award Support
    • Facilities Management
    • Philanthropy
    • Research Accounting
  • Message Center
  • Org Charts
  • Directory
Select Page

SINSHEIMER LABS – HVAC UTILITY SHUTDOWN – 7/28/21 & 7/29/21

Jul 14, 2021 | Facilities Management, Sinsheimer Building

LOCATION: Sinsheimer Labs North and South UTILITY THAT WILL BE SHUT DOWN: Ventilation System, Including Fume hoods SCHEDULED DATE:  North –  Wednesday, July 28, 2021 South – Thursday, July 29, 2021 SCHEDULED TIME: 6:30am...

BIOMED – INDUSTRIAL HOT/COLD WATER AND BUILDING STEAM- SHUTDOWN – 7/20/21

Jul 14, 2021 | Biomedical Sciences Building, Facilities Management

 INDUSTRIAL & DOMESTIC HOT/COLD WATER  AND STEAM SYSTEM SHUTDOWN     LOCATION:  BioMed UTILITY AFFECTED:  Industrial/Domestic Hot & Cold Water and Building Steam will be shut down for approximately 4 hours   SCHEDULED...

THIMANN LABS – HVAC UTILITY SHUTDOWN – 7/1/21

Jun 15, 2021 | Facilities Management, Thimann Building

LOCATION(S): Thimann Labs UTILITY TO BE SHUT DOWN: Ventilation System including Fume Hoods SCHEDULED DATE: Thursday July 1, 2021 SCHEDULED TIME: 6:30 AM  – 11:00 AM REASON: Preventive maintenance and air filter replacement IMPACTS: HVAC and Fume hoods will...

***REMINDER*** STYROFOAM COLLECTION DAY – THURSDAY 6/3/21 – PSB LOADING DOCK – 10am-2pm

Jun 1, 2021 | All Division, Facilities Management

***REMINDER*** Hello PBSci Division, Lab Managers and Facility Personnel –  In our continuing effort to reach the UC Office of the President’s appointed goals of zero waste initiatives, we wanted to inform you of a styrofoam collection day at PSB next week. ...

***REMINDER*** HIGH IMPACT WORK ADVISORY – ROOF WORK AND AIR-HANDLING REPLACEMENT PROJECT – PSB – 6/7/21 THROUGH 6/11/21

Jun 1, 2021 | Facilities Management, Physical Sciences Building

***REMINDER*** WORK TO BE PERFORMED:  The heating and cooling coils located within the PSB rooftop air handler units are being replaced, and new fans are being installed. Other maintenance needs are being addressed concurrent with this shutdown to minimize future...

CENTRAL HEAT PLANT – EMERGENCY TURBINE SHUTDOWN – TODAY 6/1/21 UNITL FURTHER NOTICE

Jun 1, 2021 | All Division, Facilities Management

PBSci Facilities EMERGENCY UTILITY SHUT DOWN LOCATION(S):  Central Heat Plant – affecting all of Science Hill COGEN powered buildings UTILITY TO BE SHUT DOWN:  Gas Fired Turbine that provides COGEN power to buildings during electrical...

STYROFOAM COLLECTION DAY – THURSDAY 6/3/21 – PSB LOADING DOCK – 10am-2pm

May 24, 2021 | All Division, Facilities Management

Hello PBSci Division, Lab Managers and Facility Personnel –  In our continuing effort to reach the UC Office of the President’s appointed goals of zero waste initiatives, we wanted to inform you of a styrofoam collection day at PSB next week.  The...

HIGH IMPACT WORK ADVISORY – ROOF WORK AND AIR-HANDLING REPLACEMENT PROJECT – PSB – 6/7/21 THROUGH 6/11/21

May 19, 2021 | Facilities Management, Physical Sciences Building

WORK TO BE PERFORMED:  The heating and cooling coils located within the PSB rooftop air handler units are being replaced, and new fans are being installed. Other maintenance needs are being addressed concurrent with this shutdown to minimize future...

Unauthorized person accessing Science Hill Buildings

May 11, 2021 | All Division, Facilities Management

Dear Science Hill Community, We received a report that an unauthorized person gained access to the Physical Sciences Building last night. The police were called and the intruder departed the area before they arrived.  We have fixed the broken lock on the room the...

STYROFOAM COLLECTION DAY – THURSDAY 4/29/21 – PSB LOADING DOCK – 10am-2pm

Apr 21, 2021 | All Division, Facilities Management

Hello PBSci Division, Lab Managers and Facility Personnel –    In our continuing effort to reach the UC Office of the President’s appointed goals of zero waste initiatives, we wanted to inform you of a styrofoam collection day at PSB next week. ...
Page 26 of 29« First«...1020...2425262728...»Last »
Back to the Message Center

Recent messages

  • SINS – UTILITY SHUTDOWN – HVAC/VENTILATION INCLUDING FUME HOODS – 09/05 – 09/07/25
  • SINSHEIMER LABS – WORK ADVISORY – HVAC & MECHANICAL CONTROLS PROJECT – BEGINS MONDAY 8/25/25
  • Two open calls: McKnight Foundation, 1-Brain Disorders Award and 2-Scholar Awards
  • Announcing Limited Submission – Greenwall Foundation – 2026 Faculty Scholars Program
  • Sinsheimer Labs – PPDO Mechanical, HVAC & Controls Renewal Project – Information and Details
Pantheon v1.0
For Faculty & Staff | Division of Physical & Biological Sciences | About Toolkit
Site feedback

Login with CruzID