E&MS – WORK ADVISORY INDUSTRIAL WATER BACKFLOW SYSTEM  08/16/23 through 8/18/23

Jul 28, 2023 | Earth & Marine Sciences Building, Facilities Management, Green House, Uncategorized

E&MS – WORK ADVISORY INDUSTRIAL WATER BACKFLOW SYSTEM  08/17/23 through 8/21/23 LOCATION: Earth & Marine Sciences UTILITY THAT WILL BE SHUT DOWN: Domestic Cold Water (DCW), Domestic Hot Water (DHW) Industrial Cold Water (ICW) & Industrial Hot Water...

NS2 & ISB – WORK ADVISORY INDUSTRIAL WATER BACKFLOW SYSTEM  08/16/23 through 8/18/23

Jul 28, 2023 | Facilities Management, Interdisciplinary Sciences Building, Natural Sciences 2 Building

NS2 & ISB – WORK ADVISORY INDUSTRIAL WATER BACKFLOW SYSTEM 08/16/23 through 8/18/23 LOCATION: Natural Sciences 2 & Interdisciplinary Sciences UTILITY THAT WILL BE SHUT DOWN: Industrial Hot & Cold Water Backflow System  SCHEDULED DATE(S): Wednesday,...

SHUTDOWN NOTICE – 2 WEEK REMINDER – HIGH IMPACT ELECTRICAL SHUTDOWN – BIOMED & JBEB/ENGINEERING 2 – 8/12/23 – 8/15/23 *DAILY*

Jul 28, 2023 | All Division, Facilities Management

LOCATIONS: BioMedical Sciences Building Jack Baskin Engineering Engineering 2 UTILITY TO BE SHUTDOWN: Electrical Utility Power* DATES OF SHUTDOWN: Saturday August 12th, 2023 through Tuesday, August 15th, 2023 (8-10 hours daily) *Due to the nature of this work, this...

PBSci Facilities Notification UTILITY SHUTDOWN – SINSHEIMER LABS HVAC/VENTILATION * INCLUDING FUME HOODS – 8/2/23 & 8/3/23

Jul 23, 2023 | Facilities Management, Sinsheimer Building, Uncategorized

PBSci Facilities Notification UTILITY SHUTDOWN – SINSHEIMER LABS LOCATION: Sinsheimer Laboratories UTILITY THAT WILL BE SHUT DOWN: Ventilation System — including Fume hoods SCHEDULED DATE(S): North — Wednesday, August 2, 2023 South — Wednesday, August 3, 2023...

UTILITY INSPECTION/TESTING – EMERGENCY & STANDBY GENERATORS – CAMPUS WIDE – 7/3/23 THROUGH 7/30/23

Jun 29, 2023 | All Division, Facilities Management

LOCATION(S):Campus WideUTILITY TO INSPECTED:Emergency & Standby GeneratorsSCHEDULED DATE(S):7/3/23 TO 7/30/23SCHEDULED TIME:7:00 AM To 4:00 PMREASON:Planned testing and inspection of emergency generators.DETAILS:Emergency and Standby generators will run for a...

ISB  – UTILITY SHUTDOWN – HVAC & VENTILATION SYSTEM – 7/12/23

Jun 27, 2023 | Facilities Management, Interdisciplinary Sciences Building

LOCATION(S):Interdisciplinary Science BuildingUTILITY TO BE SHUT DOWN:Ventilation SystemSCHEDULED DATE(S):7/12/23SCHEDULED TIME:6:30 AM To 3:30 PMREASON:Preventive maintenance and air filter replacement.  IMPACTS:There will be periodic interruptions to airflow during...

UTILITY SHUTDOWN– VENTILATION SYSTEM INCLUDING FUME HOODS – THIMANN – 7/6/23

Jun 21, 2023 | Facilities Management, Thimann Building, Uncategorized

LOCATION:Thimann UTILITY THAT WILL BE SHUT DOWN:Ventilation System — including Fume hoods SCHEDULED DATE(S):Thursday, 7/6/23 SCHEDULED TIME:6:30 AM To 11:00 AM REASON: Preventive maintenance and air filter replacement. IMPACTS:HVAC and Fume hoods will not function...

SCIENCE HILL BUILDINGS – UTILITY INSPECTION – FIRE SPRINKLER SYSTEM VISUAL INSPECTIONS – 5/30/23 THROUGH 6/16/23

May 26, 2023 | All Division, Facilities Management

To all PBSci Building Occupants: PPDO Plumbing and Alarm Shop technicians, along with an outside contractor, will be conducting State mandated building walk-throughs of various PBSci buildings to visually inspect the Fire Alarm System sprinkler heads. Inspection...

UTILITY INSPECTION & TESTING – STANDBY & EMERGENCY GENERATORS – CAMPUS WIDE – 6/5/23 THROUGH 6/30/23

May 25, 2023 | All Division, Facilities Management

LOCATION(S): Campus wide – includes all Science Hill generators UTILITY TO BE TESTED: Standby & Emergency Generators ***Load will not transfer. There will be no disruption of power. SCHEDULED DATE(S): 6/5/23 through 6/30/23 SCHEDULED TIME: 7:00 AM to 4:00 PM...

UTILITY SHUTDOWN – STANDBY GENERATOR – PHYSICAL SCIENCES BUILDING – 06/06/23

May 23, 2023 | Facilities Management, Physical Sciences Building

LOCATION(S): Physical Sciences Building UTILITY TO BE SHUT DOWN: Standby Generator SCHEDULED DATE(S): 06/06/23 SCHEDULED TIME: 6:00 AM To 5:00 PM REASON: Scheduled maintenance. There will be no load transfer – no electrical circuits will be affected. IMPACTS:...
Page 28 of 39« First«...1020...2627282930...»Last »
Back to the Message Center

Recent messages

  • 3 Open calls: PhRMA Foundation – Faculty Starter Grants
  • Two Open Calls: Schmidt Sciences – (1) AI for Actionable Matter Modelling, (2) Unconventional Compute
  • Open Call: Schmidt Sciences – National Academies Eric and Wendy Schmidt Awards for Excellence in Science Communications
  • Open call: Google.org – Impact Challenge: AI For Science
  • SINS RESTROOMS – UTILITY SHUTDOWN – DOMESTIC WATER – 02/10/26
Pantheon v1.0
For Faculty & Staff | Division of Physical & Biological Sciences | About Toolkit
Site feedback

Login with CruzID