Dec 3, 2025 | Facilities Management, Sinsheimer Building
LOCATION: Sinsheimer Labs, South Wing UTILITY TO BE SHUT DOWN: Heating Hot Water (HHW), Chilled Water (CHW), and Air Handler AHU-2 (impacting Exhaust Fans & Fume Hoods) The work requiring this Utility Shutdown directly supports the ongoing Sinsheimer HVAC &...
Nov 19, 2025 | Facilities Management, Sinsheimer Building
LOCATION(S): Sinsheimer Laboratories UTILITY TO BE TESTED: Fire Alarm System SCHEDULED DATE(S): Wednesday, December 4, 2025 to Friday, January 9, 2026 (Add this to your calendar) *Testing, maintenance and repairs will be ongoing during this time. No alarms will sound...
Nov 5, 2025 | Facilities Management, Sinsheimer Building
LOCATION: Sinsheimer Labs: Entire building, all floors UTILITY TO BE SHUT DOWN: Industrial Cold and Hot Water The work requiring this Utility Shutdown directly supports the ongoing Sinsheimer HVAC & Mechanical Controls Project currently underway in the SOUTH Wing...
Oct 31, 2025 | Facilities Management, Sinsheimer Building
LOCATION(S): Sinsheimer Labs – Third Floor, South Wing ONLY UTILITY TO BE SHUTDOWN: Fire Sprinklers *During this work, if you do hear an alarm, respond as you would to a regular fire alarm. SCHEDULED DATE(S): Thursday, November 6, 2025 (add this to your...
Oct 29, 2025 | Facilities Management, Interdisciplinary Sciences Building, Natural Sciences 2 Building, Physical Sciences Building, Sinsheimer Building, Thimann Building
LOCATION: Interdisciplinary Sciences Building Natural Sciences 2 Physical Science Building Sinsheimer Labs Thimann Labs UTILITY TO BE SHUT DOWN: Chilled Water. The work being performed for this Utility Shutdown directly supports the ongoing Sinsheimer HVAC &...
Oct 24, 2025 | Facilities Management, Sinsheimer Building
LOCATION: Sinsheimer Labs – 416, 417, 417A, 418, & 419. WORK BEING PERFORMED: PPDO & Geo H. Wilson Contractors will be continuing the large long term Sins HVAC Controls Project to replace HVAC systems in all South Wing labs, proceeding to labs 416, 417,...
Oct 24, 2025 | Facilities Management, Sinsheimer Building
LOCATION: Sinsheimer Labs – 212, 212A, 212B, 213, 213A, 214, 214A, & 215. WORK BEING PERFORMED: PPDO & Geo H. Wilson Contractors will be continuing the large long term Sins HVAC Controls Project to replace HVAC systems in all South Wing labs, proceeding...
Oct 24, 2025 | Facilities Management, Sinsheimer Building
LOCATION: Sinsheimer Labs: 112, 112A, 112B, 113, 114 ,116, 117, 117A, 119, 119A, 212, 212A, 212B, 213, 213A, 214, 214A, 215, 217, 217A, 217B, 217C, 219, 312, 312A, 312B, 313, 314, 317, 317A, 317B, 317C, 318, 319, 319A, 319B, 412, 413, 414, 417, 417A, 418, 419 UTILITY...
Oct 24, 2025 | Facilities Management, Sinsheimer Building
LOCATION: Sinsheimer Labs – Loading Dock and 2nd & 4th Floor Labs WORK BEING PERFORMED: Duct cleaning in Sinsheimer Labs 212, 212A, 212B, 213, 213A, 214, 214A, & 215, and 416, 417, 417A, 418, & 419. Cleaning hoses will come through Sinsheimer...
Oct 23, 2025 | Facilities Management, Sinsheimer Building
LOCATION(S): Sinsheimer Laboratories – Rooms 204/206 WORK BEING PERFORMED: Technicians from air valve company (CRC) will be on site to inspect installation, look at fume hood integration, and walk through new equipment with Physical Plant staff. SCHEDULED...