LOCATION (S):
Earth and Marine Science Building—C Block or “North” and D Block or “South”
UTILITIES THAT WILL BE SHUT DOWN:
Building Ventilation Systems (including fume hoods); Processed Cooling Water (connected w/ the Water Cooled Equipment), Compressed Air & Vacuum Systems, and 2nd Floor Domestic Hot Water (Showers)
SCHEDULED DATES:
Wednesday, May 3, 2023 D Block or “South”
Thursday, May 4, 2023 C Block or “North”
SCHEDULED TIME:
6:30AM TO 11:00 AM Wednesday
6:30AM TO 11:00 AM Thursday
REASON:
Preventive maintenance, repair and air filter replacement
IMPACTS:
During this time, there will be no HVAC or ventilation available in the building. Please remember to keep your fume hood sashes closed during this shutdown and refrain from working with hazardous materials during the shutdown period.
Water cooled equipment will not be supported and compressed air & vacuum systems will not be operational.
DETAILS:
Please remember to close your fume hood sashes the evening prior to this shutdown, and refrain from working with any hazardous materials in the building during the shutdown period. Fume Hoods will go into alarm if opened during shutdown.
Please let us know if you have any questions.
Thank you,
PBSci Work Order Desk Team
Jenny Coleman &
Trish Flanagan
________________________________
Physical & Biological Sciences Facilities
University of California, Santa Cruz
214 Physical Sciences Building
Office 831.459.4460