LOCATION:
Natural Sciences 2

WORK TO BE COMPLETED:
Removal of sheet rock and ceiling tiles in NS2 176

SCHEDULED DATE(S):
Thursday, April 9, 2026 (add this to your calendar)

SCHEDULED TIMES:
7:30 AM to 5:00 PM

IMPACTS:
You may see and/or hear workers completing this work around NS2 176.

DETAILS:
Safe Asbestos Abatement Notes:

  • This is emergency work that is being done as a result of a water leak in the building last week.
  • Several ceiling tiles and some drywall were destroyed by the leak, and needed to be replaced to avoid mold.
  • EHS did an assessment of the ceiling tiles and drywall. It was confirmed that asbestos is in the materials.
  • There is an approved process in place to safely remove asbestos from a room while the building is occupied. That process is being followed and monitored.
  • There will be follow up to confirm that the room/building was not contaminated.
  • Due to the nature of the work, we had very little time to get the work advisory out.

We sincerely apologize for the late notice on this work advisory. Please let us know if you have any questions.