Toolkit
  • Home
    • Academic Departments
      • ASTR
      • CHEM
      • EPS
      • EEB
      • MATH
      • MCDB
      • METX
      • OCEA
      • PHYS
    • Personnel
    • Communications
    • Computer Support
    • Curriculum Management
    • Divisional Accounting
    • Event & Award Support
    • Facilities Management
    • Philanthropy
    • Research Accounting
  • Message Center
  • Org Charts
  • Directory
Select Page

PBSCI KEYS OFFICE – OFFICE CLOSURE – **TODAY** 01/26/24

Jan 26, 2024 | All Division, Facilities Management

LOCATION(S): Physical and Biological Sciences Keys Office (PSB 216) SCHEDULED DATE: *TODAY* Friday, January 26, 2024 SCHEDULED TIME: 10:00 AM – 12:00 PM REASON: Expected disruptions on the UCSC campus. DETAILS/IMPACTS: The PBSci keys office will not be open for...

CAMPUS WIDE – UTILITY TESTING – STANDBY & EMERGENCY GENERATORS – 02/05/23 THROUGH 02/29/23

Jan 22, 2024 | All Division, Facilities Management

LOCATION(S): Across Main Campus, Westside Research Park, and Coastal Science Campus UTILITY TO BE TESTED: All Standby and Emergency Generators SCHEDULED DATE(S): Monday, February 5 through Thursday, February 29, 2024 SCHEDULED TIME: 7:00 AM to 4:00 PM REASON:...

SINS – UTILITY SHUTDOWN – HVAC INCLUDING FUME HOODS – 01/31 – 02/01/24

Jan 17, 2024 | Facilities Management, Sinsheimer Building

LOCATION: Sinsheimer Labs North & South UTILITY THAT WILL BE SHUT DOWN: Ventilation System — including Fume hoods SCHEDULED DATES: North: Wednesday, January 31, 2024 South: Thursday, February 1, 2024 SCHEDULED TIME: 6:30 AM – 11:00 AM REASON: Preventive...

SINS – UTILITY TESTING – ROLL DOWN FIRE DOORS – 1/22 – 2/2/2024

Jan 8, 2024 | Facilities Management, Sinsheimer Building

LOCATION(S): Sinsheimer Laboratories – Room 225 UTILITY TO BE TESTED: Roll down fire doors SCHEDULED DATE(S): Monday, January 22, 2024 through Friday, February 2, 2024  *Testing, maintenance, and repairs will be ongoing during this time. No alarms will sound...

BIOMED – UTILITY TESTING – FIRE ALARM SYSTEM – 1/22 – 2/23/24

Jan 8, 2024 | Biomedical Sciences Building, Facilities Management

LOCATION(S): Biomedical Sciences Building UTILITY TO BE TESTED: Fire Alarm System  SCHEDULED DATE(S): Monday, January 22, 2024 through Friday, February 23, 2024  *Testing, maintenance, and repairs will be ongoing during this time. No alarms will sound during this...

CAMPUS WIDE – UTILITY TESTING – GENERATORS – 01/08 – 01/31/24

Jan 2, 2024 | All Division, Facilities Management

LOCATION(S): Across Main Campus, Westside Research Park, and Coastal Science Campus UTILITY TO BE TESTED: All Standby and Emergency Generators SCHEDULED DATE(S): Monday, January 8 through Wednesday, January 31, 2024 SCHEDULED TIME: 7:00 AM to 4:00 PM REASON: Scheduled...

NS2 – UTILITY SHUTDOWN – STANDBY GENERATOR – 1/09/24

Jan 2, 2024 | Facilities Management, Natural Sciences 2 Building

LOCATION(S): Natural Sciences 2 UTILITY TO BE SHUT DOWN: Standby Generator – GS-24 SCHEDULED DATE(S): Tuesday, January 9, 2024 SCHEDULED TIME: 6:00 AM to 5:00 PM REASON: Scheduled maintenance. There will be no load transfer – no electrical circuits will be...

ISB – UTILITY SHUTDOWN – VENTILATION SYSTEM INCLUDING FUME HOODS – 1/10/24

Jan 2, 2024 | Facilities Management, Interdisciplinary Sciences Building

LOCATION: Interdisciplinary Sciences Building UTILITY THAT WILL BE SHUT DOWN: Ventilation System — including Fume hoods SCHEDULED DATE(S): Wednesday, January 10, 2024 SCHEDULED TIME: 6:30 AM to 3:30 PM REASON: Preventive maintenance and air filter replacement....

EMS – UTILITY TESTING – FIRE DOORS – 01/03/24

Dec 15, 2023 | Facilities Management

LOCATION(S): Earth and Marine Sciences – Atrium UTILITY TO BE TESTED: Accordion fire doors and fire alarm related controls **Horn will not be sounded. If you hear an alarm, respond as you would to a regular fire alarm. SCHEDULED DATE(S): Wednesday, January 3,...

THIM – UTILITY SHUTDOWN – VENTILATION SYSTEM, INCLUDING FUME HOODS – 01/04/24

Dec 15, 2023 | Facilities Management, Thimann Building

LOCATION: Thimann Labs UTILITY THAT WILL BE SHUT DOWN: Ventilation System — including Fume Hoods SCHEDULED DATE(S): Thursday, January 4, 2024 SCHEDULED TIME: 6:30 AM To 11:00 AM REASON: Preventive maintenance and air filter replacement. IMPACTS: HVAC and Fume hoods...
Page 12 of 27« First«...1011121314...20...»Last »
Back to the Message Center

Recent messages

  • Please Check DI Water Valves
  • CAMPUS WIDE – STAGE 1 ALERT – POTENTIAL REDUCTION TO COOLING WATER SYSTEMS – 05/05 – 05/10/25
  • THIMANN LABS – SHUTDOWN NOTIFICATION – PASSENGER ELEVATOR – 05/12/25
  • VARIOUS  BUILDINGS – UTILITY SHUTDOWN – ELECTRICITY – 05/17/25
  • BIOMED – WORK ADVISORY – SHADE MEASUREMENT – 05/08/25
Pantheon v1.0
For Faculty & Staff | Division of Physical & Biological Sciences | About Toolkit
Site feedback

Login with CruzID