Toolkit
  • Home
    • Academic Departments
      • ASTR
      • CHEM
      • EPS
      • EEB
      • MATH
      • MCDB
      • METX
      • OCEA
      • PHYS
    • Personnel
    • Communications
    • Computer Support
    • Curriculum Management
    • Divisional Accounting
    • Event & Award Support
    • Facilities Management
    • Philanthropy
    • Research Accounting
  • Message Center
  • Org Charts
  • Directory
Select Page

THIM 114 & 118 – UTILITY SHUTDOWN – FUME HOOD EXHAUST – 03/26/24

Mar 20, 2024 | Facilities Management

LOCATION: Thimann Labs: Labs 114 and 118 ONLY UTILITY THAT WILL BE SHUT DOWN: Fume hood exhaust fan 4 SCHEDULED DATE(S): Tuesday, March 26, 2024 SCHEDULED TIME: 7:30 AM to 10:00 AM REASON: HVAC needs to identify fan noise origin in fume hood exhaust fan 4 (FHEF04)....

BIOMED VIVARIUM – SHUTDOWN NOTIFICATION – NECROPSY ROOM FUME HOOD – 03/27 – 03/28/24

Mar 20, 2024 | Biomedical Sciences Building, Facilities Management

LOCATION(S): BioMedical Sciences  Building – Vivarium: Necropsy Room 0064 ONLY UTILITY TO BE SHUT DOWN: Fume hood exhaust fan (EF-7) SCHEDULED DATE(S): Wednesday, March 27 through Thursday, March 28, 2024 SCHEDULED TIME: 7:00 AM Wednesday to 3:00 PM Thursday...

THIM – UTILITY SHUTDOWN – INDUSTRIAL COLD WATER AND FIRE ALARM SYSTEM – 03/25/24

Mar 18, 2024 | Facilities Management, Thimann Building

LOCATION: Thimann labs: 2nd Floor, West Side UTILITY TO BE SHUT DOWN: Industrial Cold Water + Fire Alarm System (local to room 285 for hot work) SCHEDULED DATE: Monday, March 25, 2024 SCHEDULED TIME: 7:00 AM – 11:00 AM REASON: Connection for new autoclave in...

UTILITY INSPECTION/TESTING – EMERGENCY & STANDBY GENERATORS – CAMPUS WIDE – 04/01 – 04/23/24

Mar 18, 2024 | All Division, Facilities Management

LOCATION: Campus Wide (see building schedule below) UTILITY TO TESTED: Emergency & Standby Generators ***ALL STANDBY CIRCUITS WILL TRANSFER TO GENERATOR POWER*** SCHEDULED DATE(S): Monday, April 1 through Tuesday April 23, 2024 * Please see detailed schedule below...

CBB – UTILITY TESTING – FIRE ALARM – 03/25 – 03/28/24

Mar 13, 2024 | Coastal Biology Building, Facilities Management

LOCATIONS: Coastal Biology Building and South Science Complex (including Long Marine Lab, Ocean Health Building, and Seymour Center) UTILITY TO BE TESTED: Fire Alarm – HORNS WILL BE SOUNDED — THIS IS LOUD!  **If you do hear an alarm, respond as you would to a...

**CANCELLED** SINS ROOF/GREENHOUSE – WORK ADVISORY – DECK COATING REPLACEMENT – 03/20 – 03/22/24

Mar 13, 2024 | Facilities Management, Sinsheimer Building

LOCATION: Sinsheimer Labs Roof – Greenhouse Area WORK TO BE PERFORMED: Removing and replacing failed deck coating. SCHEDULED DATES: **TO BE RESCHEDULED SCHEDULED TIME: 7:00 AM – 5:00 PM Daily REASON: Warranty Deficiency IMPACTS: You may hear and/or see...

BIOMED – SHUTDOWN NOTIFICATION – VENTILATION SYSTEM/BUILDING STEAM – 03/21/24

Mar 7, 2024 | Biomedical Sciences Building, Facilities Management

LOCATION: BioMedical Sciences UTILITY AFFECTED: Building Ventilation System – including Fume Hoods, Processed Cooling Water connected to ice machines or any water cooled equipment in rooms 164, 264 & 364. Building Steam will also be affected.* *NOTE: Use of...

BIOMED – FIRE SPRINKLER SYSTEMS TESTING – 03/01 – 03/31/24

Mar 5, 2024 | Biomedical Sciences Building, Facilities Management

LOCATION: Biomedical Sciences Building UTILITY TO INSPECTED & TESTED: Building Fire Sprinkler Systems and Flow Switches WORK TO BE PERFORMED: The Plumbing & Fire Alarm Shops will be performing the testing of the building Fire Sprinkler waterflow and tamper...

**EXTENDED** PSB – UTILITY TESTING – FIRE ALARM SYSTEM 03/13 – 04/12/24

Feb 29, 2024 | Facilities Management, Physical Sciences Building

LOCATION(S): Physical Sciences Building UTILITY TO BE TESTED: Fire Alarm System SCHEDULED DATE(S): Wednesday, March 13 through Friday, April 12, 2024  *Testing, maintenance and repairs will be ongoing during this time. No alarms will sound during this testing. ...

PSB – UTILITY SHUTDOWN – HVAC INCLUDING FUME HOODS – 03/14/24

Feb 29, 2024 | Facilities Management, Physical Sciences Building

LOCATION: Physical Sciences Building UTILITY THAT WILL BE SHUT DOWN: Ventilation System — including Fume hoods SCHEDULED DATE(S): Thursday, March 14, 2024 SCHEDULED TIME: 6:00 AM to 11:00 AM REASON: Preventive maintenance and air filter replacement. IMPACTS: HVAC,...
Page 12 of 28« First«...1011121314...20...»Last »
Back to the Message Center

Recent messages

  • PSB – HVAC SHUTDOWN & ATRIUM SMOKE EVACUATION TESTING – 09/11/25
  • BIOMEDICAL SCIENCES BUILDING – ANNUAL LOCKDOWN TEST – 08/19/25
  • NS2 – UTILITY SHUTDOWN – VENTILATION SYSTEM INCLUDING FUME HOODS – 08/28/25
  • CBB & CSC GREENHOUSE – ANNUAL LOCKDOWN TEST – 08/18/25
  • SINS – UTILITY SHUTDOWN – HEATING HOT WATER & CHILLED WATER – 08/27/25
Pantheon v1.0
For Faculty & Staff | Division of Physical & Biological Sciences | About Toolkit
Site feedback

Login with CruzID