Toolkit
  • Home
    • Academic Departments
      • ASTR
      • CHEM
      • EPS
      • EEB
      • MATH
      • MCDB
      • METX
      • OCEA
      • PHYS
    • Personnel
    • Communications
    • Computer Support
    • Curriculum Management
    • Divisional Accounting
    • Event & Award Support
    • Facilities Management
    • Philanthropy
    • Research Accounting
  • Message Center
  • Org Charts
  • Directory
Select Page

CBB – UTILITY TESTING – FIRE ALARM SYSTEM – 11/20 – 12/20/23

Nov 7, 2023 | Facilities Management

LOCATION(S): Coastal Biology Complex UTILITY TO BE TESTED: Fire Alarm System SCHEDULED DATE(S): Monday November 20, 2023 through Wednesday December 20, 2023 *Testing, maintenance, and repairs will be ongoing during this time. No alarms will sound during this testing. ...

EMS C & D BLOCKS – SHUTDOWN NOTIFICATION – HVAC/VENTILATION INCLUDING FUME HOODS 11/01 – 11/02/23

Oct 18, 2023 | Facilities Management

LOCATION(S): Earth and Marine Science Building, C Block or “North” and D Block or “South” UTILITIES THAT WILL BE SHUT DOWN: Building Ventilation Systems (including fume hoods); Processed Cooling Water (connected w/ the Water Cooled Equipment),...

Welcome New PBSci Facilities Team Member Haylee Kim

Oct 16, 2023 | All Division, Facilities Management

 Hello PBSci Community, Please join me in welcoming Haylee Kim, our new Administrative & Work Order Desk Specialist in PBSci Facilities.  Haylee is starting her third week with us and is supporting our team with a wide scope of day-to day activities, including...

NAT SCI II & ANNEX – UTILITY TESTING – FIRE ALARM SYSTEM – 10/23 – 11/06/23

Oct 13, 2023 | Facilities Management, Natural Sciences 2 Annex, Natural Sciences 2 Building

LOCATION(S): Natural Sciences II and Natural Sciences II Annex  UTILITY TO BE TESTED: Fire Alarm System SCHEDULED DATE(S): Monday, 10/23/23 through Monday, 11/06/23  *Testing, maintenance and repairs will be ongoing during this time. No alarms will sound during this...

THIMANN – UTILITY TESTING – FIRE ALARM SYSTEM – 10/23 – 11/06/23

Oct 13, 2023 | Facilities Management

LOCATION(S): Thimann Laboratories UTILITY TO BE TESTED: Fire Alarm System SCHEDULED DATE(S): Monday, 10/23/23 through Monday, 11/06/23 *Testing, maintenance and repairs will be ongoing during this time. No alarms will sound during this testing.  SCHEDULED TIME: 7:00...

PBSCI FACILITIES WORK ADVISORY – VARIOUS SITES – ROOF & GUTTER CLEARING – OCTOBER 2023 THROUGH JANUARY 2024

Oct 5, 2023 | All Division, Facilities Management

WORK TO BE PERFORMED: Routine Planned Maintenance (PM) – Building roof & gutter clearing REASON:             Preventive Maintenance to promote proper drainage and debris build up                IMPACTS: You will see work crews on the rooftops using ladders...

PBSCI Facilities Notification CBB – UTILITY TESTING – STANDBY GENERATOR – SATURDAY – 10/14/23

Oct 5, 2023 | Coastal Biology Building, Facilities Management

LOCATION(S): Coastal Biology Building UTILITY TO BE TESTED: Standby Generator – Installation of new control system and testing SCHEDULED DATE(S): Saturday, 10/14/22 SCHEDULED TIME: 7:00 AM –  11:00 AM REASON: Install new settings on generator main breaker...

PSB ICW and Fire Alarm Shutdown

Sep 26, 2023 | Facilities Management, Physical Sciences Building

                             UTILITY SHUT DOWN LOCATION(S):   Physical Sciences Building: West Wing of Building – All Floors UTILITY TO BE SHUT DOWN:  Industrial Cold Water (West Wing of Building – All Floors) + Fire Alarm System (Room 339/339A Only) This...

PBSCI FACILITITES – UTILITY SHUTDOWN – BIOMED  STANDBY GENERATOR REPAIRS  – FRIDAY 9/22/23

Sep 12, 2023 | Biomedical Sciences Building, Facilities Management

LOCATION(S): Biomedical Sciences Building UTILITY TO BE SHUT DOWN: Standby Generator (Work being performed on only  1 of 3 generators that support building, others will remain online). SCHEDULED DATE(S): Friday,  9/22/23 SCHEDULED TIME: 6:00 AM –  5:00 PM...

PBSCI FACILITIES – BIOMED – UTILITY SHUTDOWN HVAC & VENTILATION SYSTEM – 9/21/23

Sep 11, 2023 | Biomedical Sciences Building, Facilities Management

LOCATION (S): Biomedical Sciences Building UTILITY THAT WILL BE SHUT DOWN: Building Ventilation Systems, including Fume Hoods, Processed Cooling Water (connected to ice machines and any water-cooled equipment in rooms 164, 264, and 364). Building Steam will be...
Page 16 of 29« First«...10...1415161718...»Last »
Back to the Message Center

Recent messages

  • SINS – UTILITY SHUTDOWN – HVAC/VENTILATION INCLUDING FUME HOODS – 09/05 – 09/07/25
  • SINSHEIMER LABS – WORK ADVISORY – HVAC & MECHANICAL CONTROLS PROJECT – BEGINS MONDAY 8/25/25
  • Two open calls: McKnight Foundation, 1-Brain Disorders Award and 2-Scholar Awards
  • Announcing Limited Submission – Greenwall Foundation – 2026 Faculty Scholars Program
  • Sinsheimer Labs – PPDO Mechanical, HVAC & Controls Renewal Project – Information and Details
Pantheon v1.0
For Faculty & Staff | Division of Physical & Biological Sciences | About Toolkit
Site feedback

Login with CruzID