Toolkit
  • Home
    • Academic Departments
      • ASTR
      • CHEM
      • EPS
      • EEB
      • MATH
      • MCDB
      • METX
      • OCEA
      • PHYS
    • Personnel
    • Communications
    • Computer Support
    • Curriculum Management
    • Divisional Accounting
    • Event & Award Support
    • Facilities Management
    • Philanthropy
    • Research Accounting
  • Message Center
  • Org Charts
  • Directory
Select Page

CBB/CSC – HVAC & BUILDING STEAM – SHUTDOWN – 2/17/22

Feb 9, 2022 | Coastal Biology Building, Facilities Management

CBB/CSC – HVAC & BUILDING STEAM – SHUTDOWN – 2/17/22 LOCATION: Coastal Biology Building (CBB), Headhouse & Greenhouse Buildings, CSC Core Building and CSC Auxiliary Building UTILITIES AFFECTED: Building Ventilation System – including...

SINSHEIMER – STEAM BOILER SHUTDOWN – 2/9/22 – ***NO FLY KETTLE UNTIL 2/22/22***

Feb 3, 2022 | Facilities Management, Sinsheimer Building

UTILITY TO BE SHUT DOWN: SINSHEIMER Steam Boiler This SHUTDOWN is to prepare for demolition of the rooftop boilers, these are being decommissioned as new autoclave and steam operations are in place. Note that new Autoclaves are scheduled for factory startup on...

Sinsheimer Labs HVAC Shutdown – 01/26/22 & 01/27/22

Jan 18, 2022 | Facilities Management, Sinsheimer Building

LOCATION: Sinsheimer Labs North & South UTILITY THAT WILL BE SHUT DOWN: Ventilation System — including Fume hoods SCHEDULED DATE: North:  Wednesday, January 26, 2022 South:  Thursday, January 27, 2022 SCHEDULED TIME: 6:30 am –   11:00 am REASON: ...

ISB – SHUTDOWN – HVAC & VENTILATION SYSTEM – 1/5/22

Dec 21, 2021 | Facilities Management, Interdisciplinary Sciences Building

LOCATION: Interdisciplinary Sciences Building (ISB) UTILITY AFFECTED: HVAC & Ventilation System  SCHEDULED DATE: Wednesday – January 5,  2022 SCHEDULED TIME: 6:30 AM to 3:30 PM IMPACTS: During this time, there will be no HVAC or ventilation...

THIMANN – HVAC/VENTILATION SYSTEM – SHUTDOWN – 1/6/22

Dec 21, 2021 | Facilities Management, Thimann Building

LOCATION: Thimann Labs  UTILITY AFFECTED: Ventilation System – including Fume hoods  SCHEDULED DATE: Thursday January 6, 2022 SCHEDULED TIME: 6:30 AM – 11:00 AM IMPACTS: HVAC and Fume hoods will not function during this shutdown. Please refrain...

EARTH & MARINE SCIENCES C BLOCK (NORTH LABS) – FUME HOOD EXHAUST FAN SHUTDOWN – 12/28/21

Dec 17, 2021 | Earth & Marine Sciences Building, Facilities Management

LOCATION(S): Earth and Marine C Block (North Labs) UTILITY TO BE SHUT DOWN: Fume hood Exhaust Fan EF-4 Serving rooms C512,C524A,C530A, C532C, C540A, C558,C558B, C558C, C562, C566, C570, C480, C480C, C480D, C348, C209, C230, C208, C286C and C288. SCHEDULED DATES:...

PSB – STANDBY POWER ELECTRICAL & PROCESS COOLING WATER SHUTDOWN – 12/16/2021

Dec 8, 2021 | Facilities Management, Physical Sciences Building

PBSCI FACILITIES  UTILITY SHUT DOWN STANDBY POWER/GENERATOR & PROCESS COOLING WATER LOCATION(S): Physical Sciences Building UTILITY TO BE SHUT DOWN:   — Standby Electricity. Includes all standby circuits/panels throughout the building, this includes...

WINTER CAMPUS CLOSURE INFORMATION FOR THE PHYSICAL & BIOLOGICAL SCIENCES

Dec 8, 2021 | All Division, Facilities Management

WINTER CAMPUS CLOSURE INFORMATION FOR THE PHYSICAL & BIOLOGICAL SCIENCES Receiving/Deliveries, Purchasing & Facilities Information Campus Closure Period: Thursday, December 23, 2021 through Sunday, January 2, 2022 RECEIVING/DELIVERIES – PBSci...

EMS HVAC UTILITY SHUTDOWN C&D BLOCKS – ROUTINE MAINTENANCE – 10/27/21 & 10/28/21

Oct 13, 2021 | Earth & Marine Sciences Building, Facilities Management

LOCATION: Earth and Marine Science Building, C Block or “North” and D Block or “South” UTILITY THAT WILL BE SHUT DOWN: Building Ventilation Systems (including fume hoods); Processed Cooling Water (connected w/ the Water Cooled Equipment),...

PSB HVAC SHUTDOWN & ATRIUM SMOKE EVACTUATION TESTING – 9/9/21

Sep 1, 2021 | Facilities Management, Physical Sciences Building

LOCATION(S): Physical Sciences Building UTILITY TO BE SHUT DOWN: Building Ventilation and Mechanical Systems- including Fume Hoods, Processed Cooling Water (Connected w/water cooled equipment), Compressed (Lab) Air & DI/RO Water ***CONCURRENT ATRIUM SMOKE...
Page 24 of 28« First«...10...2223242526...»Last »
Back to the Message Center

Recent messages

  • PSB – HVAC SHUTDOWN & ATRIUM SMOKE EVACUATION TESTING – 09/11/25
  • BIOMEDICAL SCIENCES BUILDING – ANNUAL LOCKDOWN TEST – 08/19/25
  • NS2 – UTILITY SHUTDOWN – VENTILATION SYSTEM INCLUDING FUME HOODS – 08/28/25
  • CBB & CSC GREENHOUSE – ANNUAL LOCKDOWN TEST – 08/18/25
  • SINS – UTILITY SHUTDOWN – HEATING HOT WATER & CHILLED WATER – 08/27/25
Pantheon v1.0
For Faculty & Staff | Division of Physical & Biological Sciences | About Toolkit
Site feedback

Login with CruzID