Toolkit
  • Home
    • Academic Departments
      • ASTR
      • CHEM
      • EPS
      • EEB
      • MATH
      • MCDB
      • METX
      • OCEA
      • PHYS
    • Personnel
    • Communications
    • Computer Support
    • Curriculum Management
    • Divisional Accounting
    • Event & Award Support
    • Facilities Management
    • Philanthropy
    • Research Accounting
  • Message Center
  • Org Charts
  • Directory
Select Page

COGEN HEAT PLANT – SHUTDOWN – 4/10/23 Through 4/13/23

Apr 6, 2023 | All Division, Facilities Management

LOCATION(S): All Science Hill buildings (supported by Cogen) UTILITY TO BE SHUT DOWN: Cogen Turbine/AKA Central Heat Plant SCHEDULED DATE(S): Monday 4/10/23 Through Thursday 4/13/23 SCHEDULED TIME: From 10:00 pm on 4/10/23 Through 4:00 pm on 4/13/23 REASON:...

BUILDING FIRE SPRINKLER SYSTEMS TESTING – BIOMED – 3/1/23 THROUGH 3/31/23

Mar 9, 2023 | Biomedical Sciences Building, Facilities Management

LOCATION(S): Biomedical Sciences Building UTILITY TO INSPECTED & TESTED: Building Fire Sprinkler Systems and Flow Switches WORK TO BE PERFORMED: The Plumbing & Fire Alarm Shops will be performing the testing of the building Fire Sprinkler waterflow and tamper...

BIOMED – UTILITY SHUTDOWN HVAC & VENTILATION SYSTEM – 3/23/23

Mar 9, 2023 | Biomedical Sciences Building, Facilities Management

LOCATION (S): Biomedical Sciences Building UTILITY THAT WILL BE SHUT DOWN: Building Ventilation Systems, including Fume Hoods, Processed Cooling Water (connected to ice machines and any water-cooled equipment in rooms 164, 264, and 364). Building Steam will be...

PSB – UTILITY TESTING- FIRE ALARM SYSTEM- 3/15/23 THROUGH 5/15/23

Mar 9, 2023 | Facilities Management, Physical Sciences Building

LOCATION(S): Physical Sciences Building UTILITY TO BE TESTED: Fire Alarm System *No horns will be sounded. If you hear an alarm, respond as you normally would to a regular fire alarm. SCHEDULED DATE(S): Wednesday, March 15, 2023 through Monday, May 15, 2023 *Testing,...

PSB – HVAC/PROCESS COOLING WATER/MECHANICAL SYSTEMS SHUTDOWN – 3/16/23

Mar 2, 2023 | Facilities Management, Physical Sciences Building

LOCATION: Physical Sciences Building UTILITY THAT WILL BE SHUT DOWN: Building Ventilation and Mechanical Systems including but not limited to:  Fume Hoods, Processed Cooling Water (connected w/ the Water Cooled Equipment), RO Water. Compressed Lab Air will not be...

UTILITY TESTING – EMERGENCY & STANDBY GENERATORS – 3/1/23 THROUGH 3/29/23

Feb 24, 2023 | All Division, Facilities Management

LOCATION(S): Campus Wide (See schedule below)* UTILITY THAT WILL BE TESTED: Emergency Generators & Standby Generators Physical Plant Electricians will be conducting the testing ALL EMERGENCY CIRCUITS WILL TRANSFER TO GENERATOR POWER SCHEDULED DATES: Wednesday,...

NS2 – UTILITY SHUTDOWN – VENTILATION SYSTEM INCLUDING FUME HOODS – 03/02/23

Feb 16, 2023 | Facilities Management, Natural Sciences 2 Building

LOCATION: Natural Sciences 2 UTILITY THAT WILL BE SHUT DOWN: Ventilation System — including Fume hoods SCHEDULED DATE(S): Thursday, March 2nd, 2023 SCHEDULED TIME: 6:00 AM To 11:00 AM REASON: Preventive maintenance and air filter replacement. IMPACTS: HVAC and Fume...

PSB – UTILITY SHUTDOWN – DOCK LEVELER – 02/23/23

Feb 9, 2023 | Facilities Management, Physical Sciences Building

LOCATION(S): Physical Sciences Building UTILITY TO BE SHUTDOWN: Dock Leveler SCHEDULED DATE: Thursday, 2/23/23 SCHEDULED TIME: 7:00 AM To 5:00 PM REASON: Scheduled maintenance. IMPACTS: Dock leveler will be unavailable during servicing and maintenance. Please let us...

CBB/HEADHOUSE & GREENHOUSE BUILDINGS HVAC/PROCESS COOLING WATER/MECHANICAL SYSTEMS SHUTDOWN – 2/23/23

Feb 9, 2023 | Coastal Biology Building, Facilities Management

LOCATION: Coastal Biology Building, Headhouse & Greenhouse Buildings,  CSC Core Building, CSC Auxiliary Building UTILITY THAT WILL BE SHUT DOWN: Building Ventilation and Mechanical Systems including but not limited to:  Fume Hoods, Processed Cooling...

BUILDING FIRE SPRINKLER SYSTEMS TESTING – EARTH & MARINE SCIENCES AND SINSHEIMER LABS – ONGOING WORK – 2/01/23 THROUGH 2/28/23

Feb 1, 2023 | Earth & Marine Sciences Building, Facilities Management, Sinsheimer Building

LOCATION(S): Earth & Marine Sciences and Sinsheimer Laboratoires UTILITY TO INSPECTED & TESTED: Building Fire Sprinkler Systems and Flow Switches WORK TO BE PERFORMED: The Plumbing & Fire Alarm Shops will be performing the testing of the building Fire...
Page 25 of 34« First«...1020...2324252627...30...»Last »
Back to the Message Center

Recent messages

  • Open Call: Greenwall Foundation – 2026 Making a Difference
  • SCIENCE HILL – TRAFFIC ADVISORY – SERVICE ROAD CLOSURE – 12/09/25
  • SINS – UTILITY TESTING – FIRE ALARM SYSTEM – 12/03/25 – 01/09/26
  • STEINHART WAY – WORK ADVISORY – TRAFFIC CONTROL – 12/03 – 12/04/25
  • CAMPUS WIDE  – UTILITY TESTING – STANDBY & EMERGENCY GENERATORS – 12/07 – 12/31/25
Pantheon v1.0
For Faculty & Staff | Division of Physical & Biological Sciences | About Toolkit
Site feedback

Login with CruzID