Toolkit
  • Home
    • Academic Departments
      • ASTR
      • CHEM
      • EPS
      • EEB
      • MATH
      • MCDB
      • METX
      • OCEA
      • PHYS
    • Personnel
    • Communications
    • Computer Support
    • Curriculum Management
    • Divisional Accounting
    • Event & Award Support
    • Facilities Management
    • Philanthropy
    • Research Accounting
  • Message Center
  • Org Charts
  • Directory
Select Page

BIOMED – HVAC & BUILDING STEAM – SHUTDOWN – 9/22/22

Sep 8, 2022 | Biomedical Sciences Building, Facilities Management

PBSci Facilities Notification BIOMED – HVAC & BUILDING STEAM – SHUTDOWN – 9/22/22 LOCATION (S): Biomedical Sciences UTILITY THAT WILL BE SHUT DOWN: Building Ventilation Systems, including Fume Hoods, Processed Cooling Water (connected to ice machines and any...

PSB HVAC SHUTDOWN & ATRIUM SMOKE EVACUATION TESTING – 9/15/22

Sep 1, 2022 | Facilities Management, Physical Sciences Building

PBSci Facilities Notification PSB – HVAC SHUTDOWN & ATRIUM SMOKE EVACUATION TESTING – 9/15/22 LOCATION(S): Physical Science Building   UTILITY THAT WILL BE SHUT DOWN: Building Ventilation and Mechanical Systems- including Fume Hoods, Processed Cooling Water...

SINS – UTILITY SHUTDOWN – DOCK LEVELER –  09/08/22

Aug 25, 2022 | Facilities Management, Sinsheimer Building

PBSci Facilities Notification   SINS – UTILITY SHUTDOWN – DOCK LEVELER –  09/08/22       LOCATION(S):Sinsheimer UTILITY TO BE SHUT DOWN:Dock Leveler SCHEDULED DATE(S):Thursday, 09/08/22 SCHEDULED TIME:7:00 am – 5:00 pm REASON:To replace a...

BIOMED – UTILITY SHUTDOWN – ELEVATOR – 8/25/22

Aug 18, 2022 | Biomedical Sciences Building, Facilities Management

PBSci Facilities Notification BIOMED – UTILITY SHUTDOWN – ELEVATOR – 8/25/22   LOCATION(S):Biomedical Sciences Building UTILITY TO BE SHUT DOWN:Passenger & Freight Elevators (not simultaneously)   SCHEDULED DATE(S):8/25/22 SCHEDULED TIME:7:00 am...

NS2- UTILITY SHUTDOWN– VENTILATION SYSTEM INCLUDING FUME HOODS – 8/25/22

Aug 10, 2022 | Facilities Management, Natural Sciences 2 Building

PBSci Facilities Notification NS2- UTILITY SHUTDOWN– VENTILATION SYSTEM INCLUDING FUME HOODS – 8/25/22 LOCATION:Natural Sciences 2 UTILITY THAT WILL BE SHUT DOWN:Ventilation System — including Fume hoods SCHEDULED DATE(S):Thursday 8/25/22 SCHEDULED TIME:6:00 am...

CBB/HEADHOUSE & GREENHOUSE BUILDINGS – HVAC/PROCESS COOLING WATER/MECHANICAL SYSTEMS – SHUTDOWN – 8/18/22

Aug 3, 2022 | Coastal Biology Building, Facilities Management

PBSci Facilities Notification HVAC/PROCESS COOLING WATER/MECHANICAL SYSTEMS – PLANNED MAINTENANCE LOCATION:Coastal Biology Building (CBB) Headhouse & Greenhouse Buildings,  CSC Core Building, CSC Auxiliary Building. UTILITIES AFFECTED:Building...

NOISE & WORK ADVISORY–SCIENCE HILL – 8/15/22 – 9/9/22

Aug 3, 2022 | All Division, Facilities Management

PBSci Facilities Notification NOISE & WORK ADVISORY – SCIENCE HILL  Pedestrian Walkway Repairs LOCATIONS & AREAS TO BE AFFECTED: Science Hill – Multiple locations:- Steinhart Way South Pathway leading  to the back of Thimann Lecture Hall-...

BIOMED – UTILITY SHUTDOWN & WORK ADVISORY –  ELEVATOR TESTING – 8/16/2022

Aug 2, 2022 | Biomedical Sciences Building, Facilities Management

PBSci Facilities Notification BIOMED – UTILITY SHUTDOWN & WORK ADVISORY –  ELEVATOR TESTING – 8/16/2022   LOCATION(S): Biomedical Sciences UTILITY TO BE SHUT DOWN: Passenger & Freight Elevators (not simultaneously) SCHEDULED...

SINS – UTILITY SHUTDOWN – DOCK LEVELERS – 7/28/22

Jul 13, 2022 | Facilities Management, Sinsheimer Building

PBSci Facilities NotificationUTILITY SHUTDOWN – SINSHEIMER – DOCK LEVELERS  – 7/28/22   LOCATION(S):Sinsheimer UTILITY AFFECTED:Dock Leveler SCHEDULED DATE:Thursday 7/28/22 SCHEDULED TIME:7:00 AM to 5:00 PMREASON:Scheduled maintenance. IMPACTS:Dock...

NOISE & WORK ADVISORY – SCIENCE HILL – 7/20/22 THROUGH 7/28/22

Jul 11, 2022 | Facilities Management

PBSci Facilities Notification NOISE & WORK ADVISORY – SCIENCE HILL __________________________________________________ RED HILL ROAD REPLACEMENT PROJECT The Demolition work on Red Hill Road will begin on Wednesday 7/20/22. This notification outlines the days...
Page 29 of 35« First«...1020...2728293031...»Last »
Back to the Message Center

Recent messages

  • ISB – WORK ADVISORY – ROOF WORK – 12/15 – 12/18/25
  • **NEXT TUES** SINS – UTILITY SHUTDOWN – DOMESTIC COLD AND HOT WATER – 12/16/25
  • **BACK IN SERVICE** EMS – EMERGENCY SHUTDOWN – RO/DI WATER SYSTEM – 12/08/25 – TBD
  • **THIS TUESDAY** SINS SOUTH – UTILITY SHUTDOWN – HVAC INCLUDING FUME HOODS – 12/09/25
  • CBB – UTILITY TESTING – FIRE SPRINKLER SYSTEMS – 12/01 – 12/31/25
Pantheon v1.0
For Faculty & Staff | Division of Physical & Biological Sciences | About Toolkit
Site feedback

Login with CruzID