Oct 3, 2025 | Facilities Management, Sinsheimer Building
LOCATION: Sinsheimer Laboratories WORK TO BE COMPLETED: Workers will be demolishing the existing concrete pad in the North Mechanical Basement. SCHEDULED DATE: **MONDAY** October 6, 2025 SCHEDULED TIME: 7:00 AM – 4:00 PM REASON: Removal of concrete pad for the...
Oct 2, 2025 | Facilities Management, Sinsheimer Building
LOCATION: Sinsheimer North Wing Labs- All Floors UTILITY THAT WILL BE SHUT DOWN: Ventilation System for all fume hoods SCHEDULED DATE(S): 10/3/2025 SCHEDULED TIME: 1:00 PM – 1:30 PM REASON: A relay connecting supply and exhaust fans to the fire alarm system is...
Sep 26, 2025 | Facilities Management, Sinsheimer Building
LOCATION: Sinsheimer Labs: South Wing Labs 109, 206, 309, and 409 UTILITY TO BE SHUT DOWN: Deionized Water SCHEDULED DATE(S): Tuesday, September 30, 2025 (add this to your calendar) SCHEDULED TIME: 7:00 AM to 12:00 PM REASON: Replacing the deionized water shut-off...
Sep 24, 2025 | Facilities Management, Sinsheimer Building
LOCATION: Sinsheimer Labs – Loading Dock and Labs 304, 306, and 311 WORK BEING PERFORMED: Duct cleaning in Sinsheimer 304, 306, and 311, Cleaning hoses will come through Sinsheimer Loading Dock up through the windows. A service vehicle will be parked at the...
Sep 24, 2025 | Facilities Management, Sinsheimer Building
LOCATION(S): Sinsheimer Laboratories – South Wing, East Side, all floors ** Affected rooms: 104, 104A, 104B, 106, 106A, 109, 109A, 109B, 111, 111A, 204, 206, 206A, 304, 306, 406 WORK TO BE COMPLETED: Construction related to the ongoing HVAC & Mechanical...
Sep 24, 2025 | Facilities Management, Sinsheimer Building
LOCATION: Sinsheimer Laboratories – 304, 306, & 311 UTILITY TO BE SHUT DOWN: Heating Hot Water and Chilled Water SCHEDULED DATE: Wednesday, October 8, 2025 (add this to your calendar) SCHEDULED TIME: 7:00 AM to 5:00 PM REASON: Installation of isolation...
Sep 22, 2025 | Facilities Management, Sinsheimer Building
LOCATION(S): Sinsheimer Labs UTILITY TO BE SHUT DOWN: Third Floor Restrooms SCHEDULED DATE(S): Monday, October 20 through Friday, January 2, Monday, December 15, 2025 to Friday, February 20, March 13, 2026 (add this to your calendar) SCHEDULED TIME: All day, daily for...
Aug 28, 2025 | Facilities Management, Sinsheimer Building
LOCATION: Sinsheimer Laboratories – South Wing, East Side, All Floors UTILITY TO BE SHUT DOWN: Heating Hot Water and Chilled Water SCHEDULED DATE: Thursday, September 4, 2025 (add this to your calendar) SCHEDULED TIME: 7:00 AM to 11:00 AM REASON: Installation...
Aug 28, 2025 | Facilities Management, Sinsheimer Building, Thimann Building
LOCATION: Thimann & Sinsheimer Labs – connecting bridge WORK BEING PERFORMED: Resurfacing of bridge/breezeway between Sinsheimer Labs’ first floor & Thimann Labs’ third floor SCHEDULED DATES: Monday, September 8 to Monday, September 15, 2025 (add this to...
Aug 25, 2025 | Facilities Management, Sinsheimer Building
LOCATION: Sinsheimer Labs – Loading Dock and Labs 204 & 206 WORK BEING PERFORMED: Duct cleaning in Sinsheimer 204 & 206, Cleaning hoses will come through Sinsheimer Loading Dock up through the windows. The work being performed for this Work Advisory...