Toolkit
  • Home
    • Academic Departments
      • ASTR
      • CHEM
      • EPS
      • EEB
      • MATH
      • MCDB
      • METX
      • OCEA
      • PHYS
    • Personnel
    • Communications
    • Computer Support
    • Curriculum Management
    • Divisional Accounting
    • Event & Award Support
    • Facilities Management
    • Philanthropy
    • Research Accounting
  • Message Center
  • Org Charts
  • Directory
Select Page

**REVISED DATE** SINS LABS – WORK ADVISORY – DUCT CLEANING – 10/09/25

Sep 24, 2025 | Facilities Management, Sinsheimer Building

LOCATION: Sinsheimer Labs – Loading Dock and Labs 304, 306, and 311 WORK BEING PERFORMED: Duct cleaning in Sinsheimer 304, 306, and 311, Cleaning hoses will come through Sinsheimer Loading Dock up through the windows. A service vehicle will be parked at the...

SINS SOUTH EAST LABS – WORK ADVISORY – REDUCED SUPPLY AIRFLOW – 10/02 – 10/09/25

Sep 24, 2025 | Facilities Management, Sinsheimer Building

LOCATION(S): Sinsheimer Laboratories – South Wing, East Side, all floors ** Affected rooms: 104, 104A, 104B, 106, 106A, 109, 109A, 109B, 111, 111A, 204, 206, 206A, 304, 306, 406 WORK TO BE COMPLETED: Construction related to the ongoing HVAC & Mechanical...

SINS – UTILITY SHUTDOWN HEATING HOT WATER & CHILLED WATER – 10/08/25

Sep 24, 2025 | Facilities Management, Sinsheimer Building

LOCATION: Sinsheimer Laboratories – 304, 306, & 311 UTILITY TO BE SHUT DOWN: Heating Hot Water and Chilled Water SCHEDULED DATE: Wednesday, October 8, 2025 (add this to your calendar) SCHEDULED TIME: 7:00 AM to 5:00 PM  REASON: Installation of isolation...

**EXTENDED** SINS LABS  – UTILITY SHUTDOWN – THIRD FLOOR RESTROOMS – 12/15/25 – 03/13/26

Sep 22, 2025 | Facilities Management, Sinsheimer Building

LOCATION(S): Sinsheimer Labs UTILITY TO BE SHUT DOWN: Third Floor Restrooms SCHEDULED DATE(S): Monday, October 20 through Friday, January 2, Monday, December 15, 2025 to Friday, February 20, March 13, 2026 (add this to your calendar) SCHEDULED TIME: All day, daily for...

SINS – UTILITY SHUTDOWN – HEATING HOT WATER & CHILLED WATER – 09/04/25

Aug 28, 2025 | Facilities Management, Sinsheimer Building

LOCATION: Sinsheimer Laboratories – South Wing, East Side, All Floors UTILITY TO BE SHUT DOWN: Heating Hot Water and Chilled Water SCHEDULED DATE: Thursday, September 4, 2025 (add this to your calendar) SCHEDULED TIME: 7:00 AM to 11:00 AM  REASON: Installation...

THIMANN & SINS LABS – WORK ADVISORY – BREEZEWAY REPAIRS – 09/08 – 09/15/25

Aug 28, 2025 | Facilities Management, Sinsheimer Building, Thimann Building

LOCATION: Thimann & Sinsheimer Labs – connecting bridge WORK BEING PERFORMED: Resurfacing of bridge/breezeway between Sinsheimer Labs’ first floor & Thimann Labs’ third floor SCHEDULED DATES: Monday, September 8 to Monday, September 15, 2025 (add this to...

SINS LABS – WORK ADVISORY DUCT CLEANING – 09/04/25

Aug 25, 2025 | Facilities Management, Sinsheimer Building

LOCATION: Sinsheimer Labs – Loading Dock and Labs 204 & 206 WORK BEING PERFORMED: Duct cleaning in Sinsheimer 204 & 206, Cleaning hoses will come through Sinsheimer Loading Dock up through the windows.  The work being performed for this Work Advisory...

SINSHEIMER – HIGH IMPACT 3-DAY SHUTDOWN – HVAC/VENTILATION SYSTEMS – FRIDAY 9/5/25 through SUNDAY 09/07/25

Aug 22, 2025 | Facilities Management, Sinsheimer Building

LOCATION: Sinsheimer Laboratories – South Wing, All Floors  UTILITY THAT WILL BE SHUT DOWN: Air Handling – Supply and Exhaust Air, including Fume Hoods. SCHEDULED DATE(S): Friday, September 5 to Sunday, September 7, 2025 (add this to your calendar) Note: this...

SINSHEIMER LABS – WORK ADVISORY – HVAC & MECHANICAL CONTROLS PROJECT – BEGINS MONDAY 8/25/25

Aug 22, 2025 | Facilities Management, Sinsheimer Building

**The work being performed for this Work Advisory directly supports the large, ongoing Sinsheimer HVAC & Mechanical Controls Project currently underway in the SOUTH Wing Labs. For more information on this project, please see the related Toolkit Sinsheimer HVAC...

VARIOUS BUILDINGS – WORK ADVISORY – ELEVATOR DOOR SMOKE CURTAIN – 08/21 – 08/22/25

Aug 19, 2025 | Biomedical Sciences Building, Facilities Management, Sinsheimer Building

LOCATIONS: Biomedical Sciences Building – Corridor 200A (between labs and elevator lobby) Sinsheimer Labs – Room 225 WORK TO BE COMPLETED: Roll Down Fire Doors will be repaired – doors will remain open during repairs, which will be ~1-2 hours in...
Page 6 of 9« First«...45678...»Last »
Back to the Message Center

Recent messages

  • SINS – UTILITY SHUTDOWN – FREIGHT ELEVATOR – 06/15/26
  • EMS – WORK ADVISORY – WINDOW REPLACEMENT – 06/22 – 06/23/26
  • *REVISED* SINS – UTILITY SHUTDOWN – VACUUM SYSTEM INCLUDING FUME HOODS – 06/23/26
  • PSB – UTILITY SHUTDOWN – HEATING HOT WATER – 06/18/26
  • CAMPUS WIDE – STAGE 1 ALERT – POTENTIAL REDUCTION TO COOLING WATER SYSTEMS – 06/10/26
Pantheon v1.0
For Faculty & Staff | Division of Physical & Biological Sciences | About Toolkit
Site feedback

Login with CruzID