LOCATION:
Earth and Marine Science Building, C Block or “North” and D Block or “South”
UTILITY THAT WILL BE SHUT DOWN:
Building Ventilation Systems (including fume hoods); Processed Cooling Water (connected w/ the Water Cooled Equipment), Compressed Air & Vacuum Systems, and 2nd Floor Domestic Hot Water (Showers).
SCHEDULED DATE:
Wednesday October 27, 2021 – D Block or “South”
Thursday October 28, 2021 – C Block or “North”
SCHEDULED TIME:
6:30 AM – 11:00 AM Wednesday
6:30 AM – 11:00 AM Thursday
REASON:
Preventive maintenance, repair, and air filter replacement
IMPACTS: Please remember to keep your fume hood sashes closed during this shutdown. Please refrain from working with hazardous materials anywhere in the C or D Blocks during the shutdown period. Water cooled equipment will not be supported and compressed air & vacuum systems will not be operational. ***Building ventilation will be disrupted/not operational. Only critical research maintenance operations should be conducted. Consult with EH&S (ehs@ucsc.edu, 459-2553) to assess and assist any extended activities. All other building personnel should avoid entering the building during the shutdown. |
Please let me know if you have any questions. |
Jenny Coleman Physical & Biological Sciences Facilities University of California, Santa Cruz 214 Physical Sciences Buildings Office 831.459.3498 Cell 831.212.0531 |