Toolkit
  • Home
    • Academic Departments
      • ASTR
      • CHEM
      • EPS
      • EEB
      • MATH
      • MCDB
      • METX
      • OCEA
      • PHYS
    • Personnel
    • Communications
    • Computer Support
    • Curriculum Management
    • Divisional Accounting
    • Event & Award Support
    • Facilities Management
    • Philanthropy
    • Research Accounting
  • Message Center
  • Org Charts
  • Directory
Select Page

PSB – UTILITY SHUTDOWN – DOCK LEVELER – 05/05/23

Apr 20, 2023 | Facilities Management, Physical Sciences Building

LOCATION(S): Physical Sciences Building UTILITY TO BE SHUTDOWN: Dock Leveler SCHEDULED DATE: Friday, 05/05/23 SCHEDULED TIME: 7:00 AM to 5:00 PM REASON: Scheduled maintenance. IMPACTS: Dock will be unavailable during servicing and maintenance. Please let us know as...

UTILITY TESTING – ELEVATOR RECALL – 4/24/23 THROUGH 4/28/23

Apr 18, 2023 | All Division, Facilities Management

***Horns will NOT be sounded*** LOCATION(S): McHenry – Passenger Elevators Ocean Health Building – Passenger Elevator Interdisciplinary Sciences Building – Passenger Elevator Physical Science Building – Passenger & Freight Elevator...

EMS – UTILITY SHUTDOWN – C WING ELEVATOR SHUTDOWN – 4-14-23

Apr 7, 2023 | Facilities Management

LOCATION(S): Earth & Marine Sciences Building C – Wing UTILITY TO BE SHUT DOWN: C – Wing Elevator SCHEDULED DATE(S): 4-14-23  SCHEDULED TIME: 11:00 AM – TBD* **The time needed to complete repairs is unknown. Expect the elevator to be out of...

COGEN HEAT PLANT – SHUTDOWN – 4/10/23 Through 4/13/23

Apr 6, 2023 | All Division, Facilities Management

LOCATION(S): All Science Hill buildings (supported by Cogen) UTILITY TO BE SHUT DOWN: Cogen Turbine/AKA Central Heat Plant SCHEDULED DATE(S): Monday 4/10/23 Through Thursday 4/13/23 SCHEDULED TIME: From 10:00 pm on 4/10/23 Through 4:00 pm on 4/13/23 REASON:...

BUILDING FIRE SPRINKLER SYSTEMS TESTING – BIOMED – 3/1/23 THROUGH 3/31/23

Mar 9, 2023 | Biomedical Sciences Building, Facilities Management

LOCATION(S): Biomedical Sciences Building UTILITY TO INSPECTED & TESTED: Building Fire Sprinkler Systems and Flow Switches WORK TO BE PERFORMED: The Plumbing & Fire Alarm Shops will be performing the testing of the building Fire Sprinkler waterflow and tamper...

BIOMED – UTILITY SHUTDOWN HVAC & VENTILATION SYSTEM – 3/23/23

Mar 9, 2023 | Biomedical Sciences Building, Facilities Management

LOCATION (S): Biomedical Sciences Building UTILITY THAT WILL BE SHUT DOWN: Building Ventilation Systems, including Fume Hoods, Processed Cooling Water (connected to ice machines and any water-cooled equipment in rooms 164, 264, and 364). Building Steam will be...

PSB – UTILITY TESTING- FIRE ALARM SYSTEM- 3/15/23 THROUGH 5/15/23

Mar 9, 2023 | Facilities Management, Physical Sciences Building

LOCATION(S): Physical Sciences Building UTILITY TO BE TESTED: Fire Alarm System *No horns will be sounded. If you hear an alarm, respond as you normally would to a regular fire alarm. SCHEDULED DATE(S): Wednesday, March 15, 2023 through Monday, May 15, 2023 *Testing,...

PSB – HVAC/PROCESS COOLING WATER/MECHANICAL SYSTEMS SHUTDOWN – 3/16/23

Mar 2, 2023 | Facilities Management, Physical Sciences Building

LOCATION: Physical Sciences Building UTILITY THAT WILL BE SHUT DOWN: Building Ventilation and Mechanical Systems including but not limited to:  Fume Hoods, Processed Cooling Water (connected w/ the Water Cooled Equipment), RO Water. Compressed Lab Air will not be...

UTILITY TESTING – EMERGENCY & STANDBY GENERATORS – 3/1/23 THROUGH 3/29/23

Feb 24, 2023 | All Division, Facilities Management

LOCATION(S): Campus Wide (See schedule below)* UTILITY THAT WILL BE TESTED: Emergency Generators & Standby Generators Physical Plant Electricians will be conducting the testing ALL EMERGENCY CIRCUITS WILL TRANSFER TO GENERATOR POWER SCHEDULED DATES: Wednesday,...

NS2 – UTILITY SHUTDOWN – VENTILATION SYSTEM INCLUDING FUME HOODS – 03/02/23

Feb 16, 2023 | Facilities Management, Natural Sciences 2 Building

LOCATION: Natural Sciences 2 UTILITY THAT WILL BE SHUT DOWN: Ventilation System — including Fume hoods SCHEDULED DATE(S): Thursday, March 2nd, 2023 SCHEDULED TIME: 6:00 AM To 11:00 AM REASON: Preventive maintenance and air filter replacement. IMPACTS: HVAC and Fume...
Page 27 of 37« First«...1020...2526272829...»Last »
Back to the Message Center

Recent messages

  • BIOMED – UTILITY SHUTDOWN – STEAM SYSTEM – 01/26 – 01/28/26 
  • SINS – UTILITY SHUTDOWN – HEATING HOT WATER & CHILLED WATER – 01/21/25
  • SINS – UTILITY SHUTDOWN – ALL RESTROOMS – 01/20/26
  • SINS LABS – UTILITY SHUTDOWN – HVAC INCLUDING FUME HOODS – 01/28 – 01/29/26
  • SINSHEIMER LABS – WORK ADVISORY – DUCT CLEANING – 01/20 – 01/21/26
Pantheon v1.0
For Faculty & Staff | Division of Physical & Biological Sciences | About Toolkit
Site feedback

Login with CruzID