Toolkit
  • Home
    • Academic Departments
      • ASTR
      • CHEM
      • EPS
      • EEB
      • MATH
      • MCDB
      • METX
      • OCEA
      • PHYS
    • Personnel
    • Communications
    • Computer Support
    • Curriculum Management
    • Divisional Accounting
    • Event & Award Support
    • Facilities Management
    • Philanthropy
    • Research Accounting
  • Message Center
  • Org Charts
  • Directory
Select Page

THIMANN – HVAC/VENTILATION SYSTEM – SHUTDOWN – 1/6/22

Dec 21, 2021 | Facilities Management, Thimann Building

LOCATION: Thimann Labs  UTILITY AFFECTED: Ventilation System – including Fume hoods  SCHEDULED DATE: Thursday January 6, 2022 SCHEDULED TIME: 6:30 AM – 11:00 AM IMPACTS: HVAC and Fume hoods will not function during this shutdown. Please refrain...

EARTH & MARINE SCIENCES C BLOCK (NORTH LABS) – FUME HOOD EXHAUST FAN SHUTDOWN – 12/28/21

Dec 17, 2021 | Earth & Marine Sciences Building, Facilities Management

LOCATION(S): Earth and Marine C Block (North Labs) UTILITY TO BE SHUT DOWN: Fume hood Exhaust Fan EF-4 Serving rooms C512,C524A,C530A, C532C, C540A, C558,C558B, C558C, C562, C566, C570, C480, C480C, C480D, C348, C209, C230, C208, C286C and C288. SCHEDULED DATES:...

PSB – STANDBY POWER ELECTRICAL & PROCESS COOLING WATER SHUTDOWN – 12/16/2021

Dec 8, 2021 | Facilities Management, Physical Sciences Building

PBSCI FACILITIES  UTILITY SHUT DOWN STANDBY POWER/GENERATOR & PROCESS COOLING WATER LOCATION(S): Physical Sciences Building UTILITY TO BE SHUT DOWN:   — Standby Electricity. Includes all standby circuits/panels throughout the building, this includes...

WINTER CAMPUS CLOSURE INFORMATION FOR THE PHYSICAL & BIOLOGICAL SCIENCES

Dec 8, 2021 | All Division, Facilities Management

WINTER CAMPUS CLOSURE INFORMATION FOR THE PHYSICAL & BIOLOGICAL SCIENCES Receiving/Deliveries, Purchasing & Facilities Information Campus Closure Period: Thursday, December 23, 2021 through Sunday, January 2, 2022 RECEIVING/DELIVERIES – PBSci...

EMS HVAC UTILITY SHUTDOWN C&D BLOCKS – ROUTINE MAINTENANCE – 10/27/21 & 10/28/21

Oct 13, 2021 | Earth & Marine Sciences Building, Facilities Management

LOCATION: Earth and Marine Science Building, C Block or “North” and D Block or “South” UTILITY THAT WILL BE SHUT DOWN: Building Ventilation Systems (including fume hoods); Processed Cooling Water (connected w/ the Water Cooled Equipment),...

PSB HVAC SHUTDOWN & ATRIUM SMOKE EVACTUATION TESTING – 9/9/21

Sep 1, 2021 | Facilities Management, Physical Sciences Building

LOCATION(S): Physical Sciences Building UTILITY TO BE SHUT DOWN: Building Ventilation and Mechanical Systems- including Fume Hoods, Processed Cooling Water (Connected w/water cooled equipment), Compressed (Lab) Air & DI/RO Water ***CONCURRENT ATRIUM SMOKE...

HIGH IMPACT ELECTRICAL SHUTDOWN – NS2, NS2 ANNEX, ISB & CfAO – 9/8/21

Aug 16, 2021 | Center for Adaptive Optics, Facilities Management, Interdisciplinary Sciences Building, Natural Sciences 2 Annex, Natural Sciences 2 Building

PBSci Facilities ELECTRICAL SHUTDOWN NOTIFICATION  NATURAL SCIENCE 2, NATURAL SCIENCE 2 ANNEX, INTERDISCIPLINARY SCIENCES BUILDING & CENTER FOR ADAPTIVE OPTICS LOCATION (S): Natural Sciences 2, Natural Sciences 2 Annex, ISB & CFAO UTILITY THAT WILL BE...

Wildfire Awareness, Preparation and Safety

Aug 13, 2021 | All Division, Facilities Management

Dear PBSci Community: With the onset of fire season, PBSci would like to direct your attention to an online resource that the UCSC Office of Emergency Services has put together to enhance awareness and safety: Wildfire Awareness Here you can find safety tips, current...

NS2 – HVAC/VENTILATION SYSTEM – SHUTDOWN – 8/26/21

Aug 13, 2021 | Facilities Management, Natural Sciences 2 Building

Natural Sciences 2 – HVAC/Ventilation System Shutdown LOCATION: Natural Sciences 2 UTILITY AFFECTED: Ventilation Systems – Including Fume Hoods SCHEDULED DATE: Thursday August 26, 2021 SCHEDULED TIME: 6:00 AM to 11:00 AM IMPACTS: HVAC and Fume hoods will...

CBB/HEADHOUSE & GREENHOUSE BUILDINGS – HVAC/PROCESS COOLING WATER/BUILDING STEAM – SHUTDOWN – 8/19/21

Aug 6, 2021 | Coastal Biology Building, Facilities Management

HVAC/PROCESS COOLING WATER/BUILDING STEAM PLANNED MAINTENANCE LOCATION: Coastal Biology Building (CBB) Headhouse & Greenhouse Buildings,  CSC Core Building, CSC Auxiliary Building UTILITIES AFFECTED: Building Ventilation System – including Fume Hoods,...
Page 31 of 35« First«...1020...2930313233...»Last »
Back to the Message Center

Recent messages

  • **NEXT TUES** SINS – UTILITY SHUTDOWN – DOMESTIC COLD AND HOT WATER – 12/16/25
  • **BACK IN SERVICE** EMS – EMERGENCY SHUTDOWN – RO/DI WATER SYSTEM – 12/08/25 – TBD
  • **THIS TUESDAY** SINS SOUTH – UTILITY SHUTDOWN – HVAC INCLUDING FUME HOODS – 12/09/25
  • CBB – UTILITY TESTING – FIRE SPRINKLER SYSTEMS – 12/01 – 12/31/25
  • SINS SOUTH – HIGH IMPACT UTILITY SHUTDOWN – BUILDING HEAT/COOLING & HVAC/AIR HANDLING – 2 WEEK DURATION: THURSDAY 12/17/25 THROUGH FRIDAY 01/02/26
Pantheon v1.0
For Faculty & Staff | Division of Physical & Biological Sciences | About Toolkit
Site feedback

Login with CruzID