Toolkit
  • Home
    • Academic Departments
      • ASTR
      • CHEM
      • EPS
      • EEB
      • MATH
      • MCDB
      • METX
      • OCEA
      • PHYS
    • Personnel
    • Communications
    • Computer Support
    • Curriculum Management
    • Divisional Accounting
    • Event & Award Support
    • Facilities Management
    • Philanthropy
    • Research Accounting
  • Message Center
  • Org Charts
  • Directory
Select Page

EMS C & D BLOCKS – SHUTDOWN NOTIFICATION – HVAC/VENTILATION INCLUDING FUME HOODS 11/01 – 11/02/23

Oct 18, 2023 | Facilities Management

LOCATION(S): Earth and Marine Science Building, C Block or “North” and D Block or “South” UTILITIES THAT WILL BE SHUT DOWN: Building Ventilation Systems (including fume hoods); Processed Cooling Water (connected w/ the Water Cooled Equipment),...

Welcome New PBSci Facilities Team Member Haylee Kim

Oct 16, 2023 | All Division, Facilities Management

 Hello PBSci Community, Please join me in welcoming Haylee Kim, our new Administrative & Work Order Desk Specialist in PBSci Facilities.  Haylee is starting her third week with us and is supporting our team with a wide scope of day-to day activities, including...

NAT SCI II & ANNEX – UTILITY TESTING – FIRE ALARM SYSTEM – 10/23 – 11/06/23

Oct 13, 2023 | Facilities Management, Natural Sciences 2 Annex, Natural Sciences 2 Building

LOCATION(S): Natural Sciences II and Natural Sciences II Annex  UTILITY TO BE TESTED: Fire Alarm System SCHEDULED DATE(S): Monday, 10/23/23 through Monday, 11/06/23  *Testing, maintenance and repairs will be ongoing during this time. No alarms will sound during this...

THIMANN – UTILITY TESTING – FIRE ALARM SYSTEM – 10/23 – 11/06/23

Oct 13, 2023 | Facilities Management

LOCATION(S): Thimann Laboratories UTILITY TO BE TESTED: Fire Alarm System SCHEDULED DATE(S): Monday, 10/23/23 through Monday, 11/06/23 *Testing, maintenance and repairs will be ongoing during this time. No alarms will sound during this testing.  SCHEDULED TIME: 7:00...

PBSCI FACILITIES WORK ADVISORY – VARIOUS SITES – ROOF & GUTTER CLEARING – OCTOBER 2023 THROUGH JANUARY 2024

Oct 5, 2023 | All Division, Facilities Management

WORK TO BE PERFORMED: Routine Planned Maintenance (PM) – Building roof & gutter clearing REASON:             Preventive Maintenance to promote proper drainage and debris build up                IMPACTS: You will see work crews on the rooftops using ladders...

PBSCI Facilities Notification CBB – UTILITY TESTING – STANDBY GENERATOR – SATURDAY – 10/14/23

Oct 5, 2023 | Coastal Biology Building, Facilities Management

LOCATION(S): Coastal Biology Building UTILITY TO BE TESTED: Standby Generator – Installation of new control system and testing SCHEDULED DATE(S): Saturday, 10/14/22 SCHEDULED TIME: 7:00 AM –  11:00 AM REASON: Install new settings on generator main breaker...

PSB ICW and Fire Alarm Shutdown

Sep 26, 2023 | Facilities Management, Physical Sciences Building

                             UTILITY SHUT DOWN LOCATION(S):   Physical Sciences Building: West Wing of Building – All Floors UTILITY TO BE SHUT DOWN:  Industrial Cold Water (West Wing of Building – All Floors) + Fire Alarm System (Room 339/339A Only) This...

PBSCI FACILITITES – UTILITY SHUTDOWN – BIOMED  STANDBY GENERATOR REPAIRS  – FRIDAY 9/22/23

Sep 12, 2023 | Biomedical Sciences Building, Facilities Management

LOCATION(S): Biomedical Sciences Building UTILITY TO BE SHUT DOWN: Standby Generator (Work being performed on only  1 of 3 generators that support building, others will remain online). SCHEDULED DATE(S): Friday,  9/22/23 SCHEDULED TIME: 6:00 AM –  5:00 PM...

PBSCI FACILITIES – BIOMED – UTILITY SHUTDOWN HVAC & VENTILATION SYSTEM – 9/21/23

Sep 11, 2023 | Biomedical Sciences Building, Facilities Management

LOCATION (S): Biomedical Sciences Building UTILITY THAT WILL BE SHUT DOWN: Building Ventilation Systems, including Fume Hoods, Processed Cooling Water (connected to ice machines and any water-cooled equipment in rooms 164, 264, and 364). Building Steam will be...

PBSCI FACILITIES UTILITY SHUTDOWN – NS2 – LAB COMPRESSED AIR – **TUESDAY 9/12/23**

Sep 8, 2023 | Facilities Management, Natural Sciences 2 Building

LOCATION: Natural Sciences 2 UTILITY AFFECTED: Building Lab Air SCHEDULED DATE: ***Tuesday, 9/12/23 SCHEDULED TIME: 7:00AM to 11:00AM IMPACTS: There will be no compressed air available during this work, please refrain from working with hazardous chemicals or...
Page 32 of 45« First«...1020...3031323334...40...»Last »
Back to the Message Center

Recent messages

  • PSB – UTILITY SHUTDOWN – HEATING HOT WATER – 06/18/26
  • CAMPUS WIDE – STAGE 1 ALERT – POTENTIAL REDUCTION TO COOLING WATER SYSTEMS – 06/10/26
  • SINS 304 – UTILITY SHUTDOWN – ICE MACHINE – 06/04/26 – TBD
  • PSB 4th FLOOR – SHUTDOWN NOTIFICATION – FIRE SPRINKLER SYSTEM – 06/09/2026
  • SINS – UTILITY SHUTDOWN – PROCESS COOLING WATER – 06/17/26
Pantheon v1.0
For Faculty & Staff | Division of Physical & Biological Sciences | About Toolkit
Site feedback

Login with CruzID