Toolkit
  • Home
    • Academic Departments
      • ASTR
      • CHEM
      • EPS
      • EEB
      • MATH
      • MCDB
      • METX
      • OCEA
      • PHYS
    • Personnel
    • Communications
    • Computer Support
    • Curriculum Management
    • Divisional Accounting
    • Event & Award Support
    • Facilities Management
    • Philanthropy
    • Research Accounting
  • Message Center
  • Org Charts
  • Directory
Select Page

THIM – UTILITY SHUTDOWN – VENTILATION SYSTEM, INCLUDING FUME HOODS – 01/09/25

Dec 20, 2024 | Facilities Management, Thimann Building

LOCATION: Thimann Labs UTILITY THAT WILL BE SHUT DOWN: Ventilation System — including Fume Hoods SCHEDULED DATE(S): Thursday, January 9, 2025 (Add this to your calendar) SCHEDULED TIME: 6:30 AM To 11:00 AM REASON: Annual preventive maintenance and air filter...

Biomed- SHUT DOWN- STEAM SYSTEM 12/12/24 *TODAY* *EMERGENCY SHUTDOWN

Dec 12, 2024 | Biomedical Sciences Building, Facilities Management

LOCATION(S):  Biomed UTILITY TO BE SHUT DOWN:      Steam – Building Wide SCHEDULED DATES: 12.12.24 – TBD SCHEDULED TIME: 7:00 AM     TO:   TBD REASON:   Steam system is down due to system failure. We will update when we get an idea from contractor on a...

PSB/SINS LABS – UTILITY SHUTDOWN – NORMAL ELECTRICITY – 12/23/24

Dec 9, 2024 | Facilities Management, Physical Sciences Building, Sinsheimer Building

LOCATION(S): Physical Sciences Building and Sinsheimer Labs UTILITY TO BE SHUT DOWN: Normal Power/Electricity SCHEDULED DATE: Monday, December 23, 2024 (add this to your calendar) SCHEDULED TIME: 7:00 AM to 9:00 AM REASON: To verify the new standby generator load...

SINS LABS – WORK ADVISORY – PRE-CONSTRUCTION MEASUREMENTS – 12/16/24 – 01/15/25

Dec 5, 2024 | Facilities Management, Sinsheimer Building

LOCATION(S): Sinsheimer Laboratories WORK BEING PERFORMED: Pre-construction TAB measurements, including devices within each lab, under PPDO Project 4000-032. BMS Tech and HVAC Mechanic will support TAB subcontractor.  SCHEDULED DATE(S): (Add this to your calendar)...

NS2 – WORK ADVISORY & UTILITY SHUTDOWN – WATER METER REPLACEMENT, WATER SERVICE – 12/16/24

Dec 2, 2024 | Facilities Management, Natural Sciences 2 Building

LOCATIONS: Natural Sciences 2 WORK TO BE PERFORMED & UTILITY TO BE SHUTDOWN: Replacement of Water Meters; Water Service SCHEDULED DATE(S): Monday, December 16, 2024 (Add this to your calendar) SCHEDULED TIME(S): 7:00 AM to 3:00 PM IMPACTS: You may see workers in...

CBB – FIRE SPRINKLER SYSTEMS TESTING – ONGOING WORK – 12/01 through 12/31/24

Nov 27, 2024 | Coastal Biology Building, Facilities Management

LOCATION(S): Coastal Biology Building UTILITY TO INSPECTED & TESTED: Building Fire Sprinkler Systems and Flow Switches WORK TO BE PERFORMED: The Plumbing & Fire Alarm Shops will be performing the testing of the building Fire Sprinkler waterflow and tamper...

NS2 – SHUTDOWN NOTIFICATION – FIRE SPRINKLER SYSTEM – 12/03/24

Nov 20, 2024 | Facilities Management, Natural Sciences 2 Building

LOCATION(S): Natural Sciences 2 Building UTILITY TO BE SHUTDOWN: Building Fire Sprinkler System *FIRE ALARM SYSTEM WILL STILL BE ACTIVE: During this work, if you do hear an alarm, respond as you would to a regular fire alarm.  SCHEDULED DATE(S): Tuesday, December 3,...

SCIENCE HILL – UTILITY TESTING – FIRE ALARM – 12/02 – 12/06/24

Nov 18, 2024 | All Division, Facilities Management

LOCATION: All Science Hill buildings Biomedical Sciences, Center for Adaptive Optics, Earth & Marine Science, Interdisciplinary Studies, Natural Science II, Physical Sciences, Sinsheimer Labs, and Thimann Labs UTILITY TO BE TESTED: Fire Alarm – HORNS WILL BE...

SCIENCE HILL – COGEN HEAT PLANT – SHUTDOWN NOTIFICATION – 12/16 – 12/17/24

Nov 18, 2024 | All Division, Facilities Management

LOCATION(S): All Science Hill buildings (supported by Cogen) **This will not impact Coastal Science Campus nor Westside Research Park UTILITY TO BE SHUT DOWN: Fackler Cogen Turbine SCHEDULED DATE(S): Monday, December 16 to Tuesday, December 17, 2024 (Add this to your...

SINS – NORTH ELEVATOR – SHUTDOWN NOTIFICATION – 12/02 – 12/06/24

Nov 18, 2024 | Facilities Management, Sinsheimer Building

LOCATION(S): Sinsheimer North Elevator (#21) SCHEDULED DATE(S): Monday, December 2 to Friday, December 6, 2024 (Add this to your calendar) SCHEDULED TIMES: 8:00 AM on 12/2/24 to 4:00 PM on 12/6/24 REASON: Replacing ropes IMPACTS/DETAILS: Please plan experiments and...
Page 6 of 27« First«...45678...20...»Last »
Back to the Message Center

Recent messages

  • EXTENDED : Science Hill – Santa Cruz Fire Dept Training – 7/21/25 and 7/23/25
  • Open Call – Elsa U. Pardee Foundation – Innovative Cancer Research Grants
  • SC Fire Department training on Science Hill at Red Square : 8am – 5pm on July 7th, 9th and 11th
  • Concrete Drilling in PSB 7/4/2025
  • Open Call: John Templeton Foundation – Online Funding Inquiry
Pantheon v1.0
For Faculty & Staff | Division of Physical & Biological Sciences | About Toolkit
Site feedback

Login with CruzID