Toolkit
  • Home
    • Academic Departments
      • ASTR
      • CHEM
      • EPS
      • EEB
      • MATH
      • MCDB
      • METX
      • OCEA
      • PHYS
    • Personnel
    • Communications
    • Computer Support
    • Curriculum Management
    • Divisional Accounting
    • Event & Award Support
    • Facilities Management
    • Philanthropy
    • Research Accounting
  • Message Center
  • Org Charts
  • Directory
Select Page

CAMPUS WIDE  – UTILITY TESTING – STANDBY & EMERGENCY GENERATORS – 02/01 – 02/28/26

Jan 21, 2026 | Facilities Management

LOCATION(S): Campus wide – including WRP and CSC UTILITY TO BE TESTED: Standby & Emergency Generators ***Load will not transfer. There will be no disruption of power. SCHEDULED DATE(S): Sunday, February 1 to Saturday, February 28, 2025 (add this to your...

UPDATE UTILITY RESTORED SINS Restrooms Shutdown 1/20/26

Jan 20, 2026 | Facilities Management, Sinsheimer Building

UPDATE: Service has been restored to all restrooms except the third floor restrooms which are closed for construction LOCATION: Sinsheimer Labs: Restrooms, all floors UTILITY TO BE SHUT DOWN: Domestic Cold and Hot Water to Restrooms SCHEDULED DATE: Tuesday, January...

BIOMED – UTILITY SHUTDOWN – STEAM SYSTEM – 01/26 – 01/28/26 

Jan 16, 2026 | Biomedical Sciences Building, Facilities Management

LOCATION(s): Biomedical Sciences Building UTILITY AFFECTED: Steam System – Building Wide SCHEDULED DATES: Monday (night), January 26 to Wednesday, January 28, 2026 (add this to your calendar) SCHEDULED TIME: 6:00 AM to 3:30 PM (Except Monday, which will only be...

SINS – UTILITY SHUTDOWN – HEATING HOT WATER & CHILLED WATER – 01/21/25

Jan 15, 2026 | Facilities Management, Sinsheimer Building

UTILITY TO BE SHUT DOWN/LOCATION/SCHEDULED TIME: Chilled Water to Sinsheimer Labs 212B, 213, 213A, 214, 215, 312B, 312C, 313, 314, 315: 7:00 AM – 11:00 AM Heating Hot Water to Sinsheimer Labs 206, 409: 11:00 AM – 3:00 PM  The work requiring this Utility Shutdown...

SINS – UTILITY SHUTDOWN – ALL RESTROOMS – 01/20/26

Jan 14, 2026 | Facilities Management, Sinsheimer Building

LOCATION: Sinsheimer Labs: Restrooms, all floors UTILITY TO BE SHUT DOWN: Domestic Cold and Hot Water to Restrooms SCHEDULED DATE: Tuesday, January 20, 2026 (add this to your calendar) SCHEDULED TIME: 7:00 AM to 5:00 PM  REASON: Replacement of water valves in third...

SINS LABS – UTILITY SHUTDOWN – HVAC INCLUDING FUME HOODS – 01/28 – 01/29/26

Jan 14, 2026 | Facilities Management, Sinsheimer Building

LOCATION: Sinsheimer Labs – North & South UTILITY THAT WILL BE SHUT DOWN: Ventilation System — including Fume hoods SCHEDULED DATE: North: Wednesday, January 28, 2022 South: Thursday, January 29, 2022 (add this to your calendar) SCHEDULED TIME: 6:30 AM to...

SINSHEIMER LABS – WORK ADVISORY – DUCT CLEANING – 01/20 – 01/21/26

Jan 13, 2026 | Facilities Management, Sinsheimer Building

LOCATION: Sinsheimer Labs – Loading Dock and Labs 106A, 109, 109A, 109B, 111, 112, 112A, 112B, 113, 114, 115. WORK BEING PERFORMED: Duct cleaning in Sinsheimer 106A, 109, 109A, 109B, 111, 112, 112A, 112B, 113, 114, & 115, Cleaning hoses will come through...

PSB – UTILITY SHUTDOWN – FREIGHT ELEVATOR – 01/09/26 – 01/12/26

Jan 9, 2026 | Facilities Management, Physical Sciences Building

LOCATION(S): Physical Sciences Building – Freight Elevator UNSCHEDULED DATE(S): Friday, January 9, 2026 – Monday, January 12, 2026 REASON: Elevator is out of service. Reason is unknown at this time. Vendor has been contacted. DETAILS: The PSB Freight Elevator is...

CORE WEST PARKING STRUCTURE – UTILITY SHUTDOWN – WEST ELEVATOR – 01/08/26 – TBD

Jan 9, 2026 | All Division, Facilities Management

LOCATION(S): Core West Parking Structure UTILITY TO BE SHUT DOWN: West Elevator SCHEDULED DATE(S): Thursday, January 8 to TBD SCHEDULED TIME: 11:00 AM on 01/08 to TBD REASON: Controller Programming issue – troubleshooting ongoing. IMPACTS: The west elevator is...

SINS – WORK ADVISORY – BATHROOM DEMOLITION – 01/10 – 01/11/26

Jan 9, 2026 | Facilities Management, Sinsheimer Building

LOCATION(S): Sinsheimer Labs – Third Floor Restrooms SCHEDULED DATE(S): Saturday, January 10 to Sunday, January 11, 2026 (add this to your calendar) SCHEDULED TIME: 7:00 AM to 9:00 PM, Daily WORK TO BE PERFORMED: Workers will be demolishing the ceramic tile...
Page 8 of 44« First«...678910...203040...»Last »
Back to the Message Center

Recent messages

  • Open call: Agog – Climate Futures + Immersive Media
  • *TOMORROW* PSB – UTILITY SHUTDOWN – INDUSTRIAL COLD WATER – 05/29/26
  • CBB  – UTILITY TESTING – STANDBY GENERATOR – 05/31/26
  • Open call: John Templeton Foundation – Online Funding Inquiry (OFI)
  • SINS – UTILITY SHUTDOWN – FREIGHT ELEVATOR – 05/21/2026-TBD
Pantheon v1.0
For Faculty & Staff | Division of Physical & Biological Sciences | About Toolkit
Site feedback

Login with CruzID