Toolkit
  • Home
    • Academic Departments
      • ASTR
      • CHEM
      • EPS
      • EEB
      • MATH
      • MCDB
      • METX
      • OCEA
      • PHYS
    • Personnel
    • Communications
    • Computer Support
    • Curriculum Management
    • Divisional Accounting
    • Event & Award Support
    • Facilities Management
    • Philanthropy
    • Research Accounting
  • Message Center
  • Org Charts
  • Directory
Select Page

SINS RESTROOMS – UTILITY SHUTDOWN – DOMESTIC WATER – 03/10/26

Mar 5, 2026 | Facilities Management, Sinsheimer Building

LOCATION: Sinsheimer Labs – Restrooms, all floors UTILITY TO BE SHUT DOWN: Domestic Water (Cold and Hot) to Restrooms SCHEDULED DATE: Tuesday, March 10, 2026 (add this to your calendar) SCHEDULED TIME: 8:00 AM to 12:00 PM  REASON: Replacing angle stops in the...

BIOMED – SHUTDOWN NOTIFICATION – HVAC/VENTILATION INCLUDING FUME HOODS  – 03/19/26

Mar 5, 2026 | Biomedical Sciences Building, Facilities Management

LOCATION: Biomedical Sciences Building UTILITY TO BE SHUT DOWN: Building Ventilation Systems, including Fume Hoods, Processed Cooling Water (connected to ice machines and any water-cooled equipment in rooms 164, 264, and 364). SCHEDULED DATE: Thursday, March 19, 2026...

SINS – WORK ADVISORY – DUCT CLEANING – 03/16/26

Mar 3, 2026 | Facilities Management, Sinsheimer Building

LOCATION: Sinsheimer Labs – Loading Dock and Labs 312, 312A/B, 313, & 314 WORK BEING PERFORMED: Duct cleaning in Sinsheimer 312, 312A/B, 313, & 314, cleaning hoses will come through Sinsheimer Loading Dock up through the windows. A service vehicle will...

BIOMED – UTILITY TESTING – FIRE SPRINKLER SYSTEMS – 03/2026

Feb 27, 2026 | Biomedical Sciences Building, Facilities Management

LOCATION(S): Biomedical Sciences Building  UTILITY TO INSPECTED & TESTED: Building Fire Sprinkler Systems and Flow Switches WORK TO BE PERFORMED: The Plumbing & Fire Alarm Shops will be performing the testing of the building Fire Sprinkler waterflow and tamper...

CAMPUS WIDE – STAGE 1 ALERT – POTENTIAL REDUCTION TO COOLING WATER SYSTEMS – 02/27 – 2/28/26

Feb 27, 2026 | All Division, Facilities Management

LOCATION(S): Campus Wide – All PBSci Buildings UTILITY TO BE SHUT DOWN: Potential Reduction to building Cooling Water Systems Temperature adjustments that will impact building chillers, room air conditioning, and any equipment supported by processed cooling...

PSB – UTILITY SHUTDOWN – HVAC AND MECHANICAL SYSTEMS – 03/12/26

Feb 26, 2026 | Facilities Management, Physical Sciences Building

LOCATION: Physical Sciences Building UTILITY THAT WILL BE SHUT DOWN: Building Ventilation and Mechanical Systems including but not limited to: Fume Hoods, Processed Cooling Water (connected w/ the Water Cooled Equipment), RO Water, Vacuum System. SCHEDULED DATE:...

SINS – UTILITY SHUTDOWN – ATRIUM VENTILATION – 02/26/26

Feb 23, 2026 | Facilities Management, Sinsheimer Building

LOCATION(S): Sinsheimer Laboratories – Central Atrium Area, including offices UTILITY THAT WILL BE SHUT DOWN: Center General Exhaust – Exhaust Fan EF-10 The work requiring this Utility Shutdown directly supports the ongoing Sinsheimer HVAC & Mechanical...

ISB – SHUTDOWN NOTIFICATION – ELEVATORS – 02/13/26 – TBD

Feb 20, 2026 | Facilities Management, Interdisciplinary Sciences Building

LOCATION(S): Interdisciplinary Sciences Building  SCHEDULED DATE(S): Friday, February 13, 2026 – TBD SCHEDULED TIMES: 9:30 AM on Friday to TBD REASON: Elevator malfunction, troubleshooting/repairs underway. IMPACTS/DETAILS: Please plan work and egress...

CBB – UTILITY TESTING – FIRE ALARM – 03/03 – 03/06/26

Feb 20, 2026 | Coastal Biology Building, Facilities Management

LOCATIONS: South Science Complex – Coastal Biology Campus and Long Marine Lab Complex (including Ocean Health, Seymour Center, Doyle, and Younger) UTILITY TO BE TESTED: Fire Alarm – HORNS WILL BE SOUNDED — THIS IS LOUD!  **If you do hear an alarm, respond...

BIOMED – UTILITY SHUTDOWN – HVAC & FIRE ALARM SYSTEMS – 03/04/26

Feb 20, 2026 | Biomedical Sciences Building, Facilities Management

LOCATION: Biomedical Sciences Building UTILITY THAT WILL BE SHUTDOWN: Intermittent Shutdowns of Building Ventilation Systems, including Fume Hoods and Exhaust Fans.  Components of the Fire Alarm System will also be tested. ** Note:  Do not use Fume Hoods or Steam...
Page 7 of 45« First«...56789...203040...»Last »
Back to the Message Center

Recent messages

  • THIM LABS – UTILITY SHUTDOWN – VENTILATION SYSTEM INCLUDING FUME HOODS – 07/02/26
  • BIOMED – UTILITY SHUTDOWN – HVAC & FIRE ALARM SYSTEMS – 07/01/26
  • SINS – UTILITY SHUTDOWN – FREIGHT ELEVATOR – 06/15/26
  • EMS – WORK ADVISORY – WINDOW REPLACEMENT – 06/22 – 06/23/26
  • *REVISED* SINS – UTILITY SHUTDOWN – VACUUM SYSTEM INCLUDING FUME HOODS – 06/23/26
Pantheon v1.0
For Faculty & Staff | Division of Physical & Biological Sciences | About Toolkit
Site feedback

Login with CruzID