Aug 8, 2025 | All Division, Facilities Management
LOCATION(S): All Science Hill buildings (supported by Cogen) UTILITY TO BE SHUT DOWN: Fackler Cogen Turbine and Central Heat Plant Systems SCHEDULED DATE(S): Sunday, August 24 to Friday, August 29, Saturday, August 30, 2025 (add this to your calendar) SCHEDULED TIME:...
Aug 7, 2025 | All Division, Facilities Management
LOCATION: Residential Campus (Coastal Science Campus nor WRP will be impacted) UTILITY TO BE SHUT DOWN: Electricity (Normal PG&E Power) SCHEDULED DATE(S): Sunday, September 7, 2025 (add this to your calendar) SCHEDULED TIME: 7:00 AM – 7:00 PM IMPACTS: There...
Aug 7, 2025 | Coastal Biology Building, Facilities Management
LOCATION: Coastal Biology Building, Headhouse & Greenhouse Buildings, CSC Core Building, CSC Auxiliary Building UTILITY THAT WILL BE SHUT DOWN: Building Ventilation and Mechanical Systems including but not limited to: Fume Hoods, Processed Cooling Water (connected...
Jul 25, 2025 | Earth & Marine Sciences Building, Facilities Management, Thimann Building
LOCATION(S): Earth & Marine Sciences McHenry Library Thimann Labs UTILITY THAT WILL BE SHUT DOWN: PG&E and Cogen electricity to designated buildings – generators will run and any circuitry this is on the generator will have power SCHEDULED DATES:...
Jul 17, 2025 | Facilities Management
UNIVERSITY OF CALIFORNIA, SANTA CRUZ TRAINING ADVISORY LOCATION: Science Hill, in between ISB and the Science & Engineering Library. AREA TO BE AFFECTED: Red square between ISB and the S&EL, Santa Cruz Fire Dept (SCFD) will park a fire engine near the west...
Jul 3, 2025 | Facilities Management
The Santa Cruz Fire Department will be conducting training on Science Hill at Red Square next week on Monday 7/7, Wednesday 7/9 and Friday 7/11 from 8am – 5pm each day. This is for SCFD crews to familiarize themselves with campus conditions to be better...
Jul 3, 2025 | Facilities Management, Physical Sciences Building
Dear PSB Community, On Friday, 7/4/2025 between 6:00 AM and 11:00 AM a contractor will be drilling through the concrete between the fifth and fourth floors of PSB. The only impacts will be noise, mostly on the upper floors of the building. Thank You, Chris Sartain...
Jun 25, 2025 | Facilities Management, Interdisciplinary Sciences Building
LOCATION: Interdisciplinary Sciences Building UTILITY THAT WILL BE SHUT DOWN: Ventilation System SCHEDULED DATE(S): Wednesday, July 9, 2025 (Add this to your calendar) SCHEDULED TIME: 6:30 AM to 3:30 PM REASON: Preventive maintenance and air filter replacement. ...
Jun 20, 2025 | All Division, Facilities Management
LOCATION(S): All Science Hill buildings (supported by Cogen) UTILITY TO BE SHUT DOWN: Fackler Cogen Turbine and Central Heat Plant Systems SCHEDULED DATE(S): Sunday, July 6 to Thursday, July 10, 2025 (add this to your calendar) SCHEDULED TIME: 10:00 PM on 7/6 to 3:30...
Jun 18, 2025 | Facilities Management, Thimann Building
LOCATION(S): Thimann Labs UTILITY TO BE SHUT DOWN: Ventilation System, Including Fume Hoods SCHEDULED DATE: Thursday, July 3, 2025 (add this to your calendar) SCHEDULED TIME: 6:30 AM to 11:00 AM REASON: Preventive maintenance and air filter replacement. IMPACTS: There...