Toolkit
  • Home
    • Academic Departments
      • ASTR
      • CHEM
      • EPS
      • EEB
      • MATH
      • MCDB
      • METX
      • OCEA
      • PHYS
    • Personnel
    • Communications
    • Computer Support
    • Curriculum Management
    • Divisional Accounting
    • Event & Award Support
    • Facilities Management
    • Philanthropy
    • Research Accounting
  • Message Center
  • Org Charts
  • Directory
Select Page

CAMPUS WIDE – STAGE 1 ALERT – POTENTIAL REDUCTION TO COOLING WATER SYSTEMS – 02/27 – 2/28/26

Feb 27, 2026 | All Division, Facilities Management

LOCATION(S): Campus Wide – All PBSci Buildings UTILITY TO BE SHUT DOWN: Potential Reduction to building Cooling Water Systems Temperature adjustments that will impact building chillers, room air conditioning, and any equipment supported by processed cooling...

PSB – UTILITY SHUTDOWN – HVAC AND MECHANICAL SYSTEMS – 03/12/26

Feb 26, 2026 | Facilities Management, Physical Sciences Building

LOCATION: Physical Sciences Building UTILITY THAT WILL BE SHUT DOWN: Building Ventilation and Mechanical Systems including but not limited to: Fume Hoods, Processed Cooling Water (connected w/ the Water Cooled Equipment), RO Water, Vacuum System. SCHEDULED DATE:...

SINS – UTILITY SHUTDOWN – ATRIUM VENTILATION – 02/26/26

Feb 23, 2026 | Facilities Management, Sinsheimer Building

LOCATION(S): Sinsheimer Laboratories – Central Atrium Area, including offices UTILITY THAT WILL BE SHUT DOWN: Center General Exhaust – Exhaust Fan EF-10 The work requiring this Utility Shutdown directly supports the ongoing Sinsheimer HVAC & Mechanical...

ISB – SHUTDOWN NOTIFICATION – ELEVATORS – 02/13/26 – TBD

Feb 20, 2026 | Facilities Management, Interdisciplinary Sciences Building

LOCATION(S): Interdisciplinary Sciences Building  SCHEDULED DATE(S): Friday, February 13, 2026 – TBD SCHEDULED TIMES: 9:30 AM on Friday to TBD REASON: Elevator malfunction, troubleshooting/repairs underway. IMPACTS/DETAILS: Please plan work and egress...

CBB – UTILITY TESTING – FIRE ALARM – 03/03 – 03/06/26

Feb 20, 2026 | Coastal Biology Building, Facilities Management

LOCATIONS: South Science Complex – Coastal Biology Campus and Long Marine Lab Complex (including Ocean Health, Seymour Center, Doyle, and Younger) UTILITY TO BE TESTED: Fire Alarm – HORNS WILL BE SOUNDED — THIS IS LOUD!  **If you do hear an alarm, respond...

BIOMED – UTILITY SHUTDOWN – HVAC & FIRE ALARM SYSTEMS – 03/04/26

Feb 20, 2026 | Biomedical Sciences Building, Facilities Management

LOCATION: Biomedical Sciences Building UTILITY THAT WILL BE SHUTDOWN: Intermittent Shutdowns of Building Ventilation Systems, including Fume Hoods and Exhaust Fans.  Components of the Fire Alarm System will also be tested. ** Note:  Do not use Fume Hoods or Steam...

NS2 – UTILITY SHUTDOWN – VENTILATION SYSTEM INCLUDING FUME HOODS – 02/26/26

Feb 18, 2026 | Facilities Management, Natural Sciences 2 Building

LOCATION: Natural Sciences 2 Building UTILITY THAT WILL BE SHUT DOWN: Ventilation System — including Fume hoods SCHEDULED DATE(S): Thursday, February 26, 2026 (add this to your calendar) SCHEDULED TIME: 6:00 AM to 11:00 AM REASON: Preventive maintenance and air filter...

**STARTING TODAY** ISB – WORK ADVISORY – BUILDING WINDOW CLEANING – 02/18 – 03/11/26

Feb 18, 2026 | Facilities Management, Interdisciplinary Sciences Building

LOCATION: Interdisciplinary Sciences Building WORK BEING PERFORMED: Interior and Exterior Window Cleaning SCHEDULED DATES: Wednesday, February 18 to (estimated) Wednesday, March 11, 2026 (add this to your calendar) *Approximately 3 week duration, weather permitting....

SINS – WORK ADVISORY – BREAKROOM RENOVATION – 02/14 – 02/27/26

Feb 10, 2026 | Facilities Management, Sinsheimer Building

LOCATION: Sinsheimer Laboratories – Room 352 (Breakroom) WORK TO BE COMPLETED: Demolition/Renovation of Sinsheimer 352 SCHEDULED DATE: Saturday, February 14 to Friday, February 27, 2026 (add this to your calendar) SCHEDULED TIME: All times during scheduled dates...

**CANCELLED** BIOMED – SHUTDOWN NOTIFICATION – HVAC/AIR HANDLER

Feb 9, 2026 | Biomedical Sciences Building, Facilities Management

LOCATION: Biomedical Sciences Building – Floors 1 to 4 UTILITY AFFECTED: Building Ventilation Systems including but not limited to: Fume Hoods, Vacuum System, Building Heating and Cooling. REASON: Heating water coil leak repairs for air handler 1 (AHU-1)...
Page 6 of 44« First«...45678...203040...»Last »
Back to the Message Center

Recent messages

  • *TOMORROW* PSB – UTILITY SHUTDOWN – INDUSTRIAL COLD WATER – 05/29/26
  • CBB  – UTILITY TESTING – STANDBY GENERATOR – 05/31/26
  • Open call: John Templeton Foundation – Online Funding Inquiry (OFI)
  • SINS – UTILITY SHUTDOWN – FREIGHT ELEVATOR – 05/21/2026-TBD
  • SINS – UTILITY SHUTDOWN – DOMESTIC HOT WATER – 06/02 – 06/23/26
Pantheon v1.0
For Faculty & Staff | Division of Physical & Biological Sciences | About Toolkit
Site feedback

Login with CruzID