Natural Sciences 2 – HVAC/Ventilation System Shutdown
LOCATION:
Natural Sciences 2
UTILITY AFFECTED:
Ventilation Systems – Including Fume Hoods
SCHEDULED DATE:
Thursday August 26, 2021
SCHEDULED TIME:
6:00 AM to 11:00 AM
IMPACTS:
HVAC and Fume hoods will not function during this shutdown. Please refrain from working with hazardous materials during the shutdown period. *There will be periodic interruptions to building airflow
REASON:
Preventative maintenance and air filter replacement
DETAILS:
Please remember to close your Fume hood sashes the evening prior to the shutdown and refrain from working with hazardous materials during the shutdown period.
*For building occupants: There will be periodic interruptions to building airflow during this shutdown