| LOCATION(S): Physical Sciences Building |
| UTILITY TO BE SHUT DOWN: Building Ventilation and Mechanical Systems- including Fume Hoods, Processed Cooling Water (Connected w/water cooled equipment), Compressed (Lab) Air & DI/RO Water ***CONCURRENT ATRIUM SMOKE EVACUATION TESTING*** |
| SCHEDULED DATE: Thursday September 9, 2021 |
| SCHEDULED TIMES: 6:15 AM – 8:00 AM (Atrium Smoke Evacuation testing) 6:00 AM – 12:00 PM (HVAC Shutdown) |
| REASON: Preventive maintenance, repair and air filter replacement |
| IMPACTS: HVAC and Fume hoods will not function during this shutdown. Please refrain from working with hazardous materials during the shutdown period. *There will be periodic interruptions to building airflow *** All Emergency standby power will be transferred to generator power from 6:15AM – 8:00. Please check your equipment after the brief interruption/transfer |
| DETAILS: Please remember to close your Fume hood sashes the evening prior to the shutdown and refrain from working with hazardous materials during the shutdown period. |
| *For building occupants: There will be periodic interruptions to building airflow during this shutdown Building ventilation will be disrupted/not operational. Only critical research maintenance operations should be conducted. Consult with EH&S (ehs@ucsc.edu, 459-2553) to assess and assist any extended activities. All other building personnel should avoid entering the building during the shutdown. |
| Please let me know if you have any questions. |
| Thanks |
| Jenny |