LOCATION(S):
Biomedical Sciences Building – 2nd floor door, outside 200A
WORK TO BE PERFORMED:
Roll down fire door will be repaired and operated based on smoke detector trip simulation using fire alarm controls
HORN WILL NOT BE SOUNDED
SCHEDULED DATE(S):
Monday, May 4, 2026 to Tuesday, May 5, 2026 (add this to your calendar)
*Testing, maintenance, and repairs will be ongoing during this time. No alarms will sound during this testing.
SCHEDULED TIME:
8:00 AM – 4:00 PM
REASON:
Repair of roll down fire door system (fire alarm).
IMPACTS:
Physical plant alarm technicians and roll down door service vendors will be in your buildings performing repairs on the roll down fire door & fire alarm system. The door should remain open, though it could be temporarily closed. The schedule must remain flexible in case emergency repairs are necessary.
Please let us know if you have any questions.