LOCATION(S):
All Science Hill buildings (supported by Cogen)
UTILITY TO BE SHUT DOWN:
Fackler Cogen Turbine
SCHEDULED DATE(S):
Sunday, June 23 through Monday, June 24, 2024
SCHEDULED TIME:
10 PM on Sunday to 4 PM on Monday
REASON:
Planned maintenance of the Cogen Gas Compressors and Air Compressor Control systems.
IMPACTS:
The Central Cogen Engine that provides back-up power to Science Hill buildings will be SHUT DOWN and offline for maintenance and repairs.
***Normal PG&E utility power to campus will not be affected.***
During this off-line period, IF PG&E POWER FAILS and an unplanned outage occurs, the Science Hill buildings that rely on Cogen for back-up power will only have power from their respective building standby generators.
Please let us know if you have any questions.