LOCATIONS:
Biomedical Sciences Building – Room 201
Sinsheimer Labs – Room 225
UTILITY TO BE TESTED:
Roll Down Fire Doors
***HORNS WILL NOT BE SOUNDED
*If you hear an alarm, respond as you would to a regular alarm.
SCHEDULED DATES:
Monday, February 10 through Tuesday, February 18, 2025 (add this to your calendar)
SCHEDULED TIME:
7:00 AM to 4:00 PM
REASON:
Annual preventative maintenance of the roll down fire door system (fire alarm) – this testing is code mandated.
IMPACTS:
Physical Plant alarm technicians and the roll down door service vendor will be in these buildings performing preventative maintenance on the roll down fire door & fire alarm system. Work will start as easily at 7:00 AM and the schedule must remain flexible in case emergency repairs are necessary. Testing will include sending fire doors into their close position, creating the originally designed separation between sections of the building for fire protection
We apologize for this inconvenience and appreciate your cooperation in this important building system maintenance. Please let us know if you have any questions or concerns.