LOCATION(S):
Thimann Labs
UTILITY TO BE SHUT DOWN:
Ventilation System, Including Fume Hoods
SCHEDULED DATE:
Thursday, July 3, 2025 (add this to your calendar)
SCHEDULED TIME:
6:30 AM to 11:00 AM
REASON:
Preventive maintenance and air filter replacement.
IMPACTS:
There will be periodic interruptions to airflow from 6:30 AM to 11 AM.
Please close your Fume hood sashes the evening prior to the shutdown and refrain from working with hazardous materials during the shutdown period.