Dear PSB Community,

On Friday, 7/4/2025 between 6:00 AM and 11:00 AM a contractor will be drilling through the concrete between the fifth and fourth floors of PSB.

The only impacts will be noise, mostly on the upper floors of the building.

Thank You,

Chris Sartain

(831)566-5705