LOCATION:
Thimann & Sinsheimer Labs – connecting bridge

WORK BEING PERFORMED:
Resurfacing of bridge/breezeway between Sinsheimer Labs’ first floor & Thimann Labs’ third floor

SCHEDULED DATES:
Monday, September 8 to Monday, September 15, 2025 (add this to your calendar)

SCHEDULED TIMES:
7:30 AM to 3:30 PM, every weekday
*Saturday 9/13 & Sunday 9/14 – closed 24/7 — no access so surface can dry/cure

REASON:
Remove failed existing deck coating and replace/resurface. Correct uneven surfaces to address trip hazards and do repairs for adequate ADA access.

IMPACTS:
Breezeway from Sinsheimer’s first floor to Thimann’s third floor will not be available for use during this period. 

Please contact the PBSci WO desk at 459-3498 or reply to this email for assistance or accommodation, if needed. (The alternate breezeway has special access requirements).

Please let us know if you have any questions.