LOCATION(S):
Thimann Labs – Fourth Floor (6/15 – 7/31)
Thimann Labs – Roof, Loading Dock, and West End of Building (6/16 & 6/19)

WORK BEING PERFORMED:
Replacement of two air handler units (AHU) and associated exhaust fans, located on the Thimann Labs roof.

SCHEDULED DATES:
Fourth Floor/Roof Work: Monday, June 15 to Friday, June 31, 2026 (add this to your calendar)
– Crane Lift (and related area shutdowns): Tuesday, June 16 (7 AM – 1 PM) and Friday, June 19 (7AM – 3 PM)

SCHEDULED TIMES:
General Work: 7:00 AM to 4:00 PM, daily
– Crane Lift: 6/16 – 7 AM – 1 PM and 6/19 – 7AM – 3 PM

IMPACTS:
A crane will be used to replace the air handler units on the Thimann Labs roof on 6/16 and 6/19. The crane lift will shut down the Thimann loading dock, Thimann Receiving, and the west part of the building, including the west elevator. 

You may notice noise and workers during this work. 

Please contact the PBSci WO desk at 831-459-3498 or reply to this email for assistance or accommodation, if needed. 

Please let us know if you have any questions.