Message Center Search for: Post a Message This page is restricted. Please log in via the button in the footer below to submit a message. Back to the Message Center Recent messages NS2 – UTILITY SHUTDOWN – COMPRESSED AIR SYSTEM – 05/11/24 Fackler Cogen & Central Heat Plant – Emergency Utility Shut Down – 04/22/2024-TBD EMS C & D BLOCKS – SHUTDOWN NOTIFICATION – HVAC/VENTILATION INCLUDING FUME HOODS – 05/01 – 05/02/24 Residential Power Outage 4/11/2024 SCIENCE HILL – SHUTDOWN NOTIFICATION – COGEN HEAT PLANT – 04/07 – 04/13/2024