LOCATION:
Natural Sciences 2
UTILITY THAT WILL BE SHUT DOWN:
Ventilation System — including Fume hoods
SCHEDULED DATE(S):
Thursday, March 2nd, 2023
SCHEDULED TIME:
6:00 AM To 11:00 AM
REASON:
Preventive maintenance and air filter replacement.
IMPACTS:
HVAC and Fume hoods will not function during this shutdown. Please refrain from working with hazardous materials during the shutdown period. **There will be periodic interruptions to building airflow.
*** Use of Steam Equipment (autoclaves, glass washers, etc) while building ventilation systems are down may set-off the building Fire Alarm System, causing a building-wide evacuation.***
DETAILS:
Please remember to close your Fume hood sashes the evening prior to the shutdown and refrain from working with hazardous materials during the shutdown period.
Please let us know if you have any questions.
Thank you,
PBSci Work Order Desk Team
Jenny Coleman &
Trish Flanagan
________________________________
Physical & Biological Sciences Facilities
University of California, Santa Cruz
214 Physical Sciences Building
Office 831.459.4460