Mar 24, 2026 | All Division, Facilities Management
WORK TO BE PERFORMED: Drone Survey for PPDO Project Planning LOCATIONS (See Map): • West Remote Parking Lot • Lower Heller Road • Oakes Road DETAILS: • Contractor will be performing remote survey work utilizing unmanned aircraft systems (drones) operated by licensed...
Mar 18, 2026 | All Division, Facilities Management
LOCATION(S): Campus Wide (See schedule for your building below)* UTILITY THAT WILL BE TESTED: Emergency Generators & Standby Generators ***ALL STANDBY CIRCUITS WILL TRANSFER TO GENERATOR POWER*** SCHEDULED DATES: Monday, April 6 to Thursday, April 9, 2026 (add...
Mar 16, 2026 | All Division, Facilities Management
LOCATION(S): Campus Wide – All PBSci Buildings UTILITY TO BE SHUT DOWN: Potential Reduction to building Cooling Water Systems Temperature adjustments that will impact building chillers, room air conditioning, and any equipment supported by processed cooling...
Mar 10, 2026 | All Division, Facilities Management
***Horns will NOT be sounded*** LOCATIONS: Biomedical Sciences Building – Passenger Elevators (2) Center for Adaptive Optics – Passenger Elevator Coastal Biology Building – Passenger Elevators (2) Core West Parking Garage – Passenger Elevators...
Feb 27, 2026 | All Division, Facilities Management
LOCATION(S): Campus Wide – All PBSci Buildings UTILITY TO BE SHUT DOWN: Potential Reduction to building Cooling Water Systems Temperature adjustments that will impact building chillers, room air conditioning, and any equipment supported by processed cooling...
Jan 9, 2026 | All Division, Facilities Management
LOCATION(S): Core West Parking Structure UTILITY TO BE SHUT DOWN: West Elevator SCHEDULED DATE(S): Thursday, January 8 to TBD SCHEDULED TIME: 11:00 AM on 01/08 to TBD REASON: Controller Programming issue – troubleshooting ongoing. IMPACTS: The west elevator is...
Dec 15, 2025 | All Division, Facilities Management
LOCATION(S): Steinhart Way, between Quarry Plaza and Kerr Road * See attached map. WORK TO BE PERFORMED: Fire Hydrant Flow Testing SCHEDULED DATE(S): Thursday, December 18, 2025 (Add this to your calendar) SCHEDULED TIME: 6:30 AM to 1:00 PM IMPACTS: Steinhart Way...
Nov 24, 2025 | All Division, Facilities Management
LOCATION(S): Service Road between Sinsheimer Labs and PSB * See attached traffic map. UTILITY TO BE AFFECTED: Both lanes of traffic on Hagar Drive and a section of walking path off of Hagar Drive will be closed. SCHEDULED DATE(S): Tuesday, December 9, 2025 (add this...
Nov 19, 2025 | All Division, Facilities Management
LOCATION(S): Steinhart Way, adjacent to Sinsheimer * See attached traffic map. WORK TO BE PERFORMED: Critical building system infrastructure removal and replacement SCHEDULED DATE(S): Wednesday, December 3 to Thursday, December 4, 2025 (add this to your calendar)...
Nov 19, 2025 | All Division, Facilities Management
LOCATION(S): Campus Wide – including Residential Campus, WRP and CSC UTILITY TO BE TESTED: Standby & Emergency Generators ***Load will not transfer. There will be no disruption of power. SCHEDULED DATE(S): Sunday, December 7 to Wednesday, December 31, 2025...