Toolkit
  • Home
    • Academic Departments
      • ASTR
      • CHEM
      • EPS
      • EEB
      • MATH
      • MCDB
      • METX
      • OCEA
      • PHYS
    • Personnel
    • Communications
    • Computer Support
    • Curriculum Management
    • Divisional Accounting
    • Event & Award Support
    • Facilities Management
    • Philanthropy
    • Research Accounting
  • Message Center
  • Org Charts
  • Directory
Select Page

BIOMED – UTILITY SHUTDOWN – STEAM SYSTEM – 01/26 – 01/28/26 

Jan 16, 2026 | Biomedical Sciences Building, Facilities Management

LOCATION(s): Biomedical Sciences Building UTILITY AFFECTED: Steam System – Building Wide SCHEDULED DATES: Monday (night), January 26 to Wednesday, January 28, 2026 (add this to your calendar) SCHEDULED TIME: 6:00 AM to 3:30 PM (Except Monday, which will only be...

SINS – UTILITY SHUTDOWN – HEATING HOT WATER & CHILLED WATER – 01/21/25

Jan 15, 2026 | Facilities Management, Sinsheimer Building

UTILITY TO BE SHUT DOWN/LOCATION/SCHEDULED TIME: Chilled Water to Sinsheimer Labs 212B, 213, 213A, 214, 215, 312B, 312C, 313, 314, 315: 7:00 AM – 11:00 AM Heating Hot Water to Sinsheimer Labs 206, 409: 11:00 AM – 3:00 PM  The work requiring this Utility Shutdown...

SINS – UTILITY SHUTDOWN – ALL RESTROOMS – 01/20/26

Jan 14, 2026 | Facilities Management, Sinsheimer Building

LOCATION: Sinsheimer Labs: Restrooms, all floors UTILITY TO BE SHUT DOWN: Domestic Cold and Hot Water to Restrooms SCHEDULED DATE: Tuesday, January 20, 2026 (add this to your calendar) SCHEDULED TIME: 7:00 AM to 5:00 PM  REASON: Replacement of water valves in third...

SINS LABS – UTILITY SHUTDOWN – HVAC INCLUDING FUME HOODS – 01/28 – 01/29/26

Jan 14, 2026 | Facilities Management, Sinsheimer Building

LOCATION: Sinsheimer Labs – North & South UTILITY THAT WILL BE SHUT DOWN: Ventilation System — including Fume hoods SCHEDULED DATE: North: Wednesday, January 28, 2022 South: Thursday, January 29, 2022 (add this to your calendar) SCHEDULED TIME: 6:30 AM to...

SINSHEIMER LABS – WORK ADVISORY – DUCT CLEANING – 01/20 – 01/21/26

Jan 13, 2026 | Facilities Management, Sinsheimer Building

LOCATION: Sinsheimer Labs – Loading Dock and Labs 106A, 109, 109A, 109B, 111, 112, 112A, 112B, 113, 114, 115. WORK BEING PERFORMED: Duct cleaning in Sinsheimer 106A, 109, 109A, 109B, 111, 112, 112A, 112B, 113, 114, & 115, Cleaning hoses will come through...

PSB – UTILITY SHUTDOWN – FREIGHT ELEVATOR – 01/09/26 – 01/12/26

Jan 9, 2026 | Facilities Management, Physical Sciences Building

LOCATION(S): Physical Sciences Building – Freight Elevator UNSCHEDULED DATE(S): Friday, January 9, 2026 – Monday, January 12, 2026 REASON: Elevator is out of service. Reason is unknown at this time. Vendor has been contacted. DETAILS: The PSB Freight Elevator is...

CORE WEST PARKING STRUCTURE – UTILITY SHUTDOWN – WEST ELEVATOR – 01/08/26 – TBD

Jan 9, 2026 | All Division, Facilities Management

LOCATION(S): Core West Parking Structure UTILITY TO BE SHUT DOWN: West Elevator SCHEDULED DATE(S): Thursday, January 8 to TBD SCHEDULED TIME: 11:00 AM on 01/08 to TBD REASON: Controller Programming issue – troubleshooting ongoing. IMPACTS: The west elevator is...

SINS – WORK ADVISORY – BATHROOM DEMOLITION – 01/10 – 01/11/26

Jan 9, 2026 | Facilities Management, Sinsheimer Building

LOCATION(S): Sinsheimer Labs – Third Floor Restrooms SCHEDULED DATE(S): Saturday, January 10 to Sunday, January 11, 2026 (add this to your calendar) SCHEDULED TIME: 7:00 AM to 9:00 PM, Daily WORK TO BE PERFORMED: Workers will be demolishing the ceramic tile...

Open Call: Spencer Foundation – Large Research Grants

Jan 8, 2026 | Awards & Funding, Research

The Office Foundations Relations is pleased to share this open call for funding from the Spencer Foundation.  Please forward the call to interested faculty in your departments and divisions. UCSC Contact: Caroline Rodriguez | caroline@ucsc.edu Funder: Spencer...

**BACK IN SERVICE** PSB – UTILITY SHUTDOWN – FREIGHT ELEVATOR – 01/08/26

Jan 8, 2026 | Facilities Management, Physical Sciences Building

LOCATION(S): Physical Sciences Building – Freight Elevator UNSCHEDULED DATE(S): Thursday, January 8, 2026 REASON: Elevator is out of service. Reason is unknown at this time.  DETAILS: At this time, the passenger elevator is still out of service due to mechanical...
Page 16 of 86« First«...10...1415161718...304050...»Last »
Back to the Message Center

Recent messages

  • New cultural-observances calendar for planning support
  • Building and Utility Shutdown – Multiple Facilities 8/26-9/18/2026
  • THIM GREENHOUSE – UTILITY SHUTDOWN – ELECTRICAL – 07/28/26
  • CAMPUS WIDE – STAGE 1 ALERT – POTENTIAL REDUCTION TO COOLING WATER SYSTEMS – 07/21/26
  • SINS – UTILITY SHUTDOWN – FIRE SPRINKLERS AND FLOW ALARMS – 07/21/26
Pantheon v1.0
For Faculty & Staff | Division of Physical & Biological Sciences | About Toolkit
Site feedback

Login with CruzID